|
The Scope Of Work Includes In Particular: 1) Construction Works A) Earthworks: Earthworks Performed With Backhoe Excavators With A Capacity Of Buckets Of 0.60 M3 With Transport Of Excavated Material In Self-Unloading Vehicles With A Capacity Of Over 5 To 10 T, Over A Distance Of Up To 1 Km: Category I-Ii Soil - 144,550 M3, Additional Payment For Each Additional 0.5 Km. Transport Over 1 Km, When Transporting Excavated Soil Of Categories I-Ii On Paved Roads, In Self-Dumping Vehicles With A Capacity Of Over 5 To 10 T (Removal Of Soil Not Suitable For Construction To The Contractors Landfill Along With Storage Costs) - 144,550 M3, Excavations And Trenches Made For Dumping Using Backhoes With A Bucket Capacity Of 0.60 M3, In Soil Category: I-Ii - 42,266 M3, Movement Of Previously Loosened Earth Masses At A Distance Of Up To 10 M, When Backfilling Excavations With Crawler Bulldozers With A Power Of: 55 Kw (75 Hp), Soil Category I-Iii - 42,266 M3, Compaction Of The Previously Distributed Soil Layers In The Embankment With Mechanical Compactors, In The Ground Loose, Category: I-Ii - 42,266 M3, Sleepers On The Ground, In General Construction Buildings, Made Of Compacted Loose Materials (Thickened Gravel And Sand Mixture, Soil Replacement - 84,417 M3; B) Foundation Footings: Sleepers On The Ground, In General Construction Buildings, Made Manually Of Concrete: Ordinary, Natural Aggregate B 10 T - 1,607 M3, Rectangular Reinforced Concrete Foundation Footings Made Using A Concrete Pump On A Car, Volume: Over 0.5 To 1.5 M3, C25/30 (B 30) W8 Concrete - 8.285 M3, Structure Reinforcement - Preparation And Installation Of Reinforcement Of Building And Structure Elements With Round Ribbed Steel Bars With A Diameter: Up To 7 Mm - 0.057 T., Structure Reinforcement - Preparation And Installation Of Reinforcement Of Building And Structure Elements Round Ribbed Steel Bars With A Diameter Of: 8 To 14 Mm - 0.368 T; C) Ground Beams: Sleepers On The Ground, In General Construction Buildings, Made Manually From Concrete: Ordinary, Natural Aggregate B 10 - 1.024 M3, Rectangular Concrete Foundation Strips Made Using A Concrete Pump On A Car, Width: Up To 0.6 M Ground Beams Concrete C25/30 (B 30) W8 - 5.215 M3, Structure Reinforcement - Preparation And Installation Of Reinforcement Of Building And Structure Elements With Round Ribbed Steel Bars With A Diameter Of: Up To 7 Mm - 0.064 T, Structure Reinforcement - Preparation And Installation Of Reinforcement Of Building And Structure Elements With Round Ribbed Steel Bars With A Diameter Of: 8 To 14 Mm - 0.145 T;D) Floor On The Ground: Sleepers On Ground Base, In General Construction Buildings, Made Of Compacted Loose Materials: Compacted Gravel And Sand Mixture - 34,692 M3, Sleepers On The Ground Base, In General Construction Buildings, Made Manually From Concrete: Ordinary Natural Aggregate, Foundation Made Of Cement-Stabilized Soil - 23,128 M3; E) Insulation: Horizontal Damp-Proof Insulation Made Of Wide Foil Laid: Dry - 121,96
|