1. The Subject Of The Order Is A Task Called: Construction Of A Village Community Center With A Garage Part And Technical Infrastructure In The Town Of Węzina On Plot No. 16/5. The Task Includes The Construction Of A Single-Story Building With An Attic And No Basement On A Foundation Slab. The Building Will Be Constructed Using Traditional Technology - Brick With A Gable Roof, Symmetrical, Wooden Structure With A 35-Degree Inclination Of The Main Slopes, Covered With Red Ceramic Tiles2. The Scope Of The Order Includes: 1) Construction Of A Community Center Building With A Garage Part With A Building Area Of Approx. 200 M22) Reconstruction Of The Existing Water Supply Network And Construction Of An Underground Water Supply System Ending With A Water Meter Well; 3) Construction Of A Water Connection From The Water Supply Network; 4) Construction Of An Energy Connection, An Underground Energy Installation Ended With An External Meter Box; 5) An Underground Connection Sewage System Ending With A Tight Waste Tank;6) Hardening The Area With 4 Parking Spaces (1 For Disabled People);7) Hardening The Square For Solid Waste Containers;8) Tight Liquid Waste Tank With A Prefabricated Or Monolithic Reinforced Concrete Structure With A Capacity Of 10 M3.9) Made Of A Tight Underground Rainwater Retention Tank With A Usable Capacity Of 3 M3 Made Of Plastic, Resistant To Weather Conditions And Corrosion; 10) Hardening The Area (Sidewalks, Roads, Communication); 11) Disassembly And Reassembly Of The Elements Of The Outdoor Gym In The Place Indicated By The Investor. 3. The Scope Of The Order Also Includes: 1) Full Geodetic Services (All Required Geodetic Measurements, Including An As-Built Geodetic Inventory); 2) Performance Of Tests, Tests And Measurements Required By Law And Specified In The Swz (Including Technical Specifications), 3) Timely Preparation Of The Necessary Documents Required For The Implementation Of The Works, Such As: A Statement From The Construction Manager, Work Managers, As Well As All Other Documents Required During Construction (E.G. A Declaration On The Readiness Of The Connected Installation) And For Acceptance Works,4) Preparation Of As-Built Documentation.4. The Detailed Scope Of Works Covered By This Order Was Determined In Accordance With Art. 103 Section 1 Of The Public Procurement Law Using: 1) Design Documentation /Appendix No. 7/2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb) /App. No. 8/As Well As Additionally Based On: 3) Bills Of Quantities /App. No. 9/.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120987693
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.