|
Task I - National Roads And Some District Roads Scope - The Task Includes National Roads And Sections Of District Roads In Accordance With The Annex - Implementation Scope Plan.• National: Beskidzka, Mikołowska, Oświęcimska, Turyńska• District: Katowicka, Al. Bielsko, Przemysłowa, Towarowa, Education, Construction, Niepodległości, Dmowski, Jana Pawła Ii, Piłsudski, Sikorski, Wyszyński, Armii Krajowej, Żwakowskathe Scope Of The Order Includes Partial Renovations Of Bituminous Surfaces, Including: • Repair By Sealing, Longitudinal And Transverse Cracks In The Surface With Asphalt Grout • Partial Renovation Of Road Surfaces With A Mineral-Bituminous Mixture, Wearing Course With The Use Of Natural Aggregate With Cutting The Edges Of The Defect/Without Cutting The Edges Of The Defect.• Partial Renovation Of The Pavement And Bicycle Paths With A Mineral-Bitumen Mixture, Wearing Course Using Natural Aggregate With Cutting The Edges Of The Defect.• Partial Renovation Of The Surface With A Mineral-Bituminous Mixture, Cold, With Cutting The Edges Of The Defect/Without Cutting The Edges Of The Defect.• Partial Renovation Of The Surface With A Mixture From A Hot Recycler. Using Reclaimed Asphalt With/Without Cutting The Edges Of The Defect. • Conducting 24/7 Dispatcher Duty. Dispatcher Service Includes Receiving And Registering Reports And Immediately Providing The Ordering Party With Information About Each Received Report. Note: The Obligation To Secure Reported Failures Covers All Categories Of Roads, I.E. National, District And Municipal Roads. The Obligation To Remove Reported Failures Applies Only To National Roads And Indicated Sections Of District Roads, In Accordance With The Appendix: Implementation Scope Plan.• Execution Of Mini Overlays, Including: - Milling The Surface To A Depth Of 4 Cm Including Removal And Disposal - Laying The Binding Pipe Ac 16 W Or Ac 11 W, Thick. 4 Cm Including Cleaning And Sprinkling - Laying The Ac 11 S Abrasive Pipe, Thick. 4 Cm Including Cleaning And Sprinkling - Laying The Sma11 Inlet, Thick. 4 Cm Including Cleaning And Sprinklingadditionally: 1. Development And Approval Of Temporary Traffic Organization Designs As Well As Assembly, Maintenance And Dismantling. In The Case Of Typical Works Related To The Maintenance Of Road Surfaces, Sidewalks And Bicycle Paths That Do Not Require Complete Closure Of The Road To Motor Vehicle Traffic, It Is Allowed To Use Temporary Traffic Organization Schemes Provided By The Ordering Party Tor-Typówki. In The Case Of Works Carried Out At Road Intersections With A Speed Limit Of Up To 50 Km/H Or Above This Value, As Well As In Particularly Complicated Situations, The Contractor Is Obliged To Develop And Obtain Approval Of A Separate Temporary Organization Design Traffic.2. Possible Protection Of Trees - In Accordance With The Documentation: Greenery-Areas-Management-System And Tree Protection Instructions. 3. Ensuring Possible Industry Supervision. A Detailed Description Of The Order
|