Reconstruction Of The Road Ul. J. Hallera Together With Stormwater Drainage, Including: - Organization Of The Construction Site Along With The Development And Introduction Of Temporary Traffic Organization Approved By The Żory Municipal Office, - Before The Commencement Of Works, Carrying Out Load-Bearing Capacity Tests With A Vss Slab (In The Presence Of The Investors Supervision Inspector) To Determine The Load-Bearing Capacity Of The Existing Structure, - Earthworks - Excavation (Trenching) For The Road Surface On The Implemented Section In Accordance With The Design Documentation And Bill Of Quantities Works (Scope Of Works Related To Soil Stabilization, To Be Performed Depending On The Results Of Load-Bearing Tests), - Leveling, Strengthening And Preparation Of The Existing Sub-Base For The Construction Of The Surface And Roadside (E2 >100Mpa) (Including Possibly Supplementing The Sub-Base), - Stabilizing The Soil With Cement C1.5/2 Min. 20 Cm (To Be Performed Depending On The Results Of Load-Bearing Tests), - Making The Base With C90/3 Grit Aggregate. 17Cm (E2 >100Mpa) (To Be Performed Depending On The Results Of Load-Bearing Capacity Tests), - Delivery And Installation Of Drive-On Curbs With A Foundation And Reinforcement Made Of Cement Concrete, - Construction Of Road Surfaces From A Mineral-Asphalt Mixture - Wearing Course Thickness. 7Cm, - Construction Of A 50Cm-Wide Roadside Made Of Asphalt Cutter (With The Addition Of Binder) - 2 Layers Of 10Cm, - Leveling, Topsoil, Sowing The Adjacent Area With Grass, - Loading And Removal Of Demolition Materials That Cannot Be Reused For Disposal, - Drainage Of Roads Through Street Gullies And Wells With Connection To The Existing Sewage System Deszczowa, Loading And Removal Of Materials That Cannot Be Rebuilt Or Disposed Of, Vertical Adjustment Of Manholes For Water And Gas Valves, Vertical Adjustment Of Telecommunication Chambers, Vertical Adjustment Of Manholes Of The Existing Sanitary Sewage System, Topsoiling And Grassing Of The Adjacent Area, Tidying Up The Area After Construction Works, All Covers Should Be Adjusted To The Minimum Class. D400 (If Necessary, Replace Existing Elements With New Ones), Laboratory Support Should Be Provided For All Stages Of Works. All Test And Test Results Should Be Attached To The As-Built Documentation Along With The Location Of The Tests Performed. Scope Of Electrical Works: Lighting Ul. Hallera Circuit 4A And 4B Scope Of Works: - Laying Of The Yakxs 4X35 Mm2 Cable Line - 812 M, - Installation Of Lighting Poles - 17 Sets, - Installation Of Lighting Fixtures - 17 Pcs.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120987670
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.