1. The Subject Of The Construction Project Is The Construction Of A Rainwater And Meltwater Management System At The Primary School No. 4 In Oborniki. The Order Aims To Improve The General Aesthetics Of The Area Around The School, Improve Communication Within It And Improve The Quality Of Functioning Of School Children And Youth By Creating A Green Space Conducive To Relaxation And Integration. The Planned Retention Reservoir Will Additionally Enable Proper Management And Use Of Rainwater, Which Will Improve Bioretention In This Area.2.The Order Includes: 1) Execution Of Construction Works Consisting In Draining Rainwater And Snowmelt Water From The Roof Of The School Building Located In Oborniki At Obrzycka Street No. 88 And Collecting It In Plastic Retention Tanks Located Under The Surface Of The Ground In The Vicinity Of The Existing Building. Rainwater Will Be Introduced Into The Designed Reservoirs Through The Construction Of A New Installation. Existing Pipelines Draining Water Directly From The Roof To The Installation Leading Through The Connection To The Main Stormwater Sewage System In Harcmistrza Jan Miękusa Street. New Installation Via A Fi1000 Kd1 Well Allowing To Capture Water And Discharge It To A Collecting Well - A Fi1000 Concrete Well With A Sedimentation Tank. The Kd1 Well Will Capture Water And Direct It Through A New Installation Of Sn8 Pvc Pipes With A Diameter Of 315 Mm To The Tanks. Excess Water In The Tanks Will Be Drained Through A Bypass Connecting The Tanks With The Existing Well And, In The Case Of Excess Incoming Water, Through An Overflow Bypass In The Kd1 Well. Rainwater Collected In The Tanks Will Be Used To Irrigate The Nearby Greenery - The Garden. The Volume Of The Tanks Was Selected Based On Calculations And The Available, Agreed Location For Installing The Installation. The Assumptions Include Filling The Reservoir During Rains And Snowmelt, And Emptying It During Irrigation Of The Green Area. The Irrigation Installation Assumes The Construction Of One Intake Well With An Sr Distributor, From Which Water Will Supply The Irrigation System. Water From The Tanks Will Be Delivered To The Sr Well Under Pressure By Deep Well Pumps - 2 Pcs. Pumps Equipped With An Inverter And A Pressure Sensor For The Irrigation Installation. Additionally, The Technical Study Provides For Water Supply From The Water Supply Network By Building An Installation From The School Corridor To The Reservoirs. A Measuring System Is Designed In The Installation In The Technical Room That Will Calculate The Amount Of Water Used For Garden Irrigation. The Section Of The Installation Is Designed To Be Made Of Pe100rc Pipes Dn32, From The Water Meter To The Sr Distribution Well, And Of Galvanized Steel Pipes From The Point Of Connection To The Existing Installation To The Water Meter Node In The Utility Room. 2) Land Development At Primary School No. 4. Unicef In Oborniki, Including New Plantings, Construction Of Paths And Small Architecture Elem
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120987669
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.