|
1. The Subject Includes The Design And Construction Of A Complete Pszok In Pogroszyn, On Part Of The Registration Plot No. 686/2, District 0011, Along With Land Development, Infrastructure, Equipment And The It System For The Service Of The Point, In The Design And Build Formula. The Task Should, In Particular, Develop Documentation Enabling The Proper Implementation And Acceptance Of All Planned Elements Of The Pszok, Including: 1) Land Development And Communication System, 2) Paved Surfaces Intended For Vehicle Traffic With An Area Of Approx. 1085 M², 3) Access Road With An Area Of Approx. 487 M², 4) Sidewalks With An Area Of Approx. 75 M², 5) Social And Office Container With An Area Of Approx. 15 M², 6) Storage Shed With An Area Of Approx. 72-74 M², 7) Warehouse Waste, Including Hazardous Waste And Weee, 8) Collection Point For Used Items Intended For Reuse With A Workshop And Educational Function, 9) Composting Gardens, 10) Fencing And Entrance Gate, 11) Electrical Installation, Lighting And Lightning Protection Installation, 12) Monitoring Installation, 13) Water Supply Installation With A Connection And A Fire Hydrant, 14) Sewage Installation With A Tight Tank Septic Tank, 15) Rainwater And Meltwater Management System, 16) Vehicle Scales, 17) Other Elements Of Infrastructure And Equipment Necessary For The Proper Functioning Of Pszok, Including The Final Electricity Connection. 2. Detailed Requirements Are Set Out In Total: Annex No. 1 - Opz, Annex No. 1A - Pfu, Annex No. 13 - Explanations And Corrections Of The Pfu, Location Decision With A Graphic Attachment, Natural Inventory And Geotechnical Documentation.3. The Order Includes In Particular The Design Of All Industries, Obtaining The Required Decisions And Arrangements, Construction And Installation Works, Deliveries, Launch Of The Scale And The Registration System, Training, Tests, As-Built Documentation And Activities Enabling The Use Of The Facility, To The Extent Specified In The Opz And The Contract.4. Whenever The Documentation Contains References To Trademarks, Patents, Origin, Source, Specific Process, Standards, Assessments Or Technical Specifications, They Must Be Read With The Words Or Equivalent In Accordance With Article 99 And 101 Pzp. The Contractor Demonstrates That The Equivalent Solution Meets The Requirements Specified In The Procurement Documentation.
|