1. The Subject Of The Investment Is The Reconstruction Of The Road On The Section From Gr. Pomeranian Voivodeship And West Pomeranian Voivodeship To From The Intersection With Dp 1742G And 2503G - Stage I, Kowała Commune, Człuchów Poviat, Pomeranian Voivodeship. The Beginning Of The Works Is At The Intersection With District Roads No. 1742G And 2503G, And The End Of Stage I Is At Km 0+695. The Length Of The Reconstructed Road In Stage I Is 695 Meters. The Road Planned For Reconstruction Currently Has A Dirt Surface, Partly Improved With Gravel. The Existing Roadway Is 4 To 5 M Wide. After Reconstruction, The Road Will Have A Surface Of Jomb Road Slabs Laid In Traces With The Space Between Them Filled With Crushed Aggregate 0/31.5 Mm. Along The Passing Lanes And Intersections, Jomb Boards Will Be Laid In A Full, Not Trace Arrangement. The Passing Lanes And Some Of The Exits Will Also Be Made Of Jomb Boards, While The Remaining Exits And Shoulders Will Be Made Of A Mixture Of Crushed Aggregate 0/31.5 Mm. Width Of The Road Crown: 5.0 M, Passing Areas With The Road Road: 6 M And Slants 10 M Long, All Made Of Jomb Boards. The Road Grade Will Be Connected To The Existing One. Cross Road Slopes: 2%. The Exits Are Planned In Currently Existing Places. The Following Structure Was Adopted For The Road Surface: - Wearing Layer Of Jomb-Type Reinforced Concrete Slabs Laid In 1 M Increments, With A Break Of 1 M Of Crushed Aggregate, Along The Length Of The Passes And Intersections, Slabs Laid Along The Entire Width Of The Road, - Base Layer Of A Mixture Of Crushed Aggregate Of Thickness. 15 Cm - The Existing Ground Surface, Profiled And Compacted. The Shoulders And Exits Are Planned To Be Made Of A Mixture Of Crushed Aggregate 0/31.5 Mm, Mechanically Stabilized, With A Thickness: Shoulders 12 Cm, Exits 15 Cm. Rainfall And Snowmelt Water Will Be Discharged On The Surface To The Adjacent Area Through Appropriate Transverse And Longitudinal Slopes.2. A Detailed Description Of The Subject Of The Order Is The Design Documentation Constituting Annex No. 8 To The Swz Together With The Bill Of Quantities, Technical Specification For The Execution And Acceptance Of Construction Works. The Contractor Is Responsible For The Quality And Compliance With The Technical And Quality Requirements Specified For The Subject Of The Order. The Materials And Devices Used Must Be Brand New And Meet The Requirements Of Products Approved For Marketing And Use In Construction, Specified In The Construction Law Act. 3. Warranty Period For The Subject Of The Order - Minimum 36 Months.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120983912
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.