1. The Subject Of The Order Is The Implementation Of The Task Titled: Expansion Of The Drinking Water Intake At Dworcowa Street In The City Of Panki, Panki Commune, Consisting In The Design And Execution Of Construction Works For The Investment Carried Out In The Design And Build System. 1.1.The Subject Of The Order Includes The Preparation Of Complete Design Documentation For All Industries Necessary For The Implementation Of Construction Works, Formal And Legal Activities, Obtaining Consents And Decisions, Permits, Construction, Installation And Technological Works, Supplies And Assembly Of Devices And Activities Related To The Commissioning (Start-Up Of The Wwtp Technology), Checking And Commissioning Of A Complete, Efficient And Functional Water Treatment Plant With A Capacity Of 25 M3/H (600 M3/D With 24 Hours Of Operation With This Efficiency) Along With The Necessary Technical And Technological Infrastructure, Land Development And Obtaining An Occupancy Permit. The System Is Intended To Ensure The Quality Of Water Intended For Human Consumption Required By Current Law, In Particular The Requirements Of The Regulation Of The Minister Of Health Of May 22, 2026. (Journal Of Laws, Item 748), At The Design Capacity, Recovery Of Rinsing Water And Safe Cooperation Of Both Stations.1.2.Investment Location: Plot With Registration Number 302/6, District 0002 Cyganka / Panki Commune.2.The Scope Of Work Covered By This Task Includes In Particular: 2.1.Design Documentation - Includes The Development Of Complete Multi-Discipline Design Documentation Based On The Functional And Utility Program And Data Contained In The Provided Documents, Prepared In Accordance With Applicable Law, Necessary To Perform Construction And Assembly Works, Verification Of Existing Facilities And Installations. Including In Particular: 1) Obtaining Or Updating The Necessary Materials For Design, Including Maps For Design Purposes, Data On Utilities, Power Supply Conditions And Intake Parameters, As Well As Identification Of Soil And Water Conditions, As Well As Research And Opinions Needed To Adopt Design Solutions, 2) Preparation Of A Land Development Design, Architectural And Construction Design, Technical Design And A Multi-Discipline Detailed Design, 3) Submission To The Ordering Party For Approval Of Design Solutions And A Plot Or Land Development Design And Design Architectural And Construction Before Submitting An Application For A Building Permit. 4) Obtaining, On Behalf Of The Ordering Party, On The Basis Of Authorization, A Decision On A Building Permit And The Required Opinions, Arrangements And Other Consents Related To The Scope Of Works. This Also Applies To Legally Required Water And Environmental Activities, If Required. Due To The Proximity Of The Railway Area, The Required Arrangements Must Be Obtained With The Relevant Railway Entity In Accordance With Point 4.5 Of The Pfu.5) Development And Submission Of A Work Schedule Including The Sequence Of Works And S
|