Replacement Of Worn-Out Ssp Devices Of The Museum Of Noble Tradition In Waplewo Wielkie).1. The Subject Of The Order Is The Continuation Of The First Stage (Completed In 2025) Regarding The Replacement Of Worn-Out Ssp Devices In The Sierakowski Palace In Waplewo Wielkie, And Will Include Stage Two / Loop 1 - Basement, Ground Floor, Orangery, First Floor And Stage Three / Loop 3 + Control - Palace, Basement, First Floor, Attic (According To The Documentation Available). As-Built July 2011). It Was Planned To Replace Worn-Out Detection And Actuator Elements, Switch The Installation In The Main Building Of The Sierakowski Palace From The Old Schrack Integral-Evolution Control Panel To The Existing Polon 6000 Control Panel And Dismantle The Existing Control Panel.2. The Scope Of Work Includes Dismantling The Devices Of The Schrack Integral - Evolution System, 2.1. Disassembly Of 1 Piece Of Sap Schrack Integral-Evolution Control Panel, 2.2. Disassembly Of 92 Schrack System Smoke Detectors, 2.3. Dismantling 92 Pieces Of Schrack System Detector Sockets, 2.4. Disassembly Of 1 Piece Of Schrack Linear Smoke Detector, 2.5. Disassembly Of 1 Pc. Schrack Control Module. 2.6. Disassembly Of 11 Manual Fire Call Points (Rop), 2.7. Disassembly Of 1 Piece Of Optical-Acoustic Signaling Device.3. Purchase And Installation Of Devices (In Places Of Dismantled Devices) For The Existing Polon 6000 Fire Control Panel, 3.1. Installation Of 1 Pc. Relay Output Module (4Pk) Mpk-60, 3.2. Installation Of 92 New Detector Sockets - G-40, 3.3. Installation Of 92 Smoke Detectors Of The System - Duo-6046, 3.4. Installation Of 1 Piece Of Linear Smoke Detector -Dop 6001, 3.5. Assembly 11 Pcs. Housing For Manual Fire Call Point - Rm-60-R, 3.6. Installation Of 11 New Manual Fire Alarms - Rop 4001 With Base, 3.7. Assembly 1 Pc. Acoustic And Optical Signaling Device - Sa-K7n, 3.8. Installation Of 1 Pc. Control And Control Modules With Housing - Eks 6022,3.9. Installation Of Optical Addressable Two-Band Smoke Detectors (Uv And Ir),3.10. Overvoltage And Checking Of The Threat Alarm Line To The Control Panel,3.11. Expansion Of The Existing Sap Polon 6000 Control Panel With A New Line Package, Reconnecting The Transmitting Station To The Polon 6000 Control Panel And Checking Fire Notification To The State Fire Service, 3.12. Configuration Of Existing Alarm System Software, Testing - The Entire Sap System, 1.13. Performing Tests Of All Installed Linear Elements,3.14. Preparing New Maps And Updating The Ifter Eq Visualization System,3.15. Preparation Of As-Built Documentation (Agreed With The Appraiser) - A Plan For The Arrangement Of Detectors In The Fire Alarm System Along With The Configuration Of Address Elements Assigned To A Particular Line For Stages I, Ii, Ii, 3.16. Conducting Training In The Field Of Handling And Response To Events Triggered By The Sap Polon 6000 System,3.17. Disposal, Scrapping Of 198 Pieces Of Dismantled Elements.
|