Brief Description Of The Subject Of The Order: 1. The Subject Of The Order Is The Construction Of Municipal Roads In The Housing Estate At Ul. Strzelecka In Odolanów Along With Drainage - Stage Ii, The Scope Of Which Includes The Construction Of The Road Ul. Wierzbowa With Drainage. The Investment In Question Is Aimed At: Construction Of Municipal Roads In The Housing Estate At Ul. Strzelecka In Odolanów - Ul. Willow With Drainage - Length 96.00 M. The Municipal Road Under Construction Is Located On Plot 2085, Odolanów District. The Contractor Is Obliged To Perform All Services And Construction Works Resulting From The Technical Documentation, Decisions, Arrangements And Opinions, As Well As From The Contract. As Part Of The Construction Works, The Following Works Should Be Performed: 1) Construction Of A Rainwater Drainage System On Ul. Wierzbowa In The Form Of Two Sewage Wells And A Channel Made Of 160 Mm Pvc Pipes. Construction Works Should Be Carried Out On The Basis Of A Technical Design Developed By Intech Biuro Projektowe, Ul. Bolesława Śmiały 6, 63-500 Ostrzeszów. The Scope Of Work Includes: - Marking Of Works In Accordance With The Approved Temporary Traffic Organization Project, - Execution Of Measurement Works, - Surveying Service And Post-Construction Inventory Of The Task, - Demolition Of A Sewage Well With Plugging Of The Sewer, - Removal Of Demolition Debris, - Execution Of Earthworks, - Installation Of A Pipeline Made Of Pvc Pipes, Diameter 160 Mm, - Installation Of Concrete Sewage Chambers, Diameter 600 Mm.2) Construction Of The Street Surface. Wierzbowa: Construction Works Should Be Performed On The Basis Of The Technical Design Prepared By Mjm Biuro Projektowe Jarosław Mikoś, Ul. Jasna 5/38, 63-604 Baranów. The Scope Of Work Includes: - Marking Of Works In Accordance With The Approved Temporary Traffic Organization Project, - Performance Of Measurement Works, - Geodetic Service And Post-Construction Inventory Of The Task, - Demolition Works (Concrete Cubes, Foundation Made Of Cement-Stabilized Soil, Concrete Curbs And Edges, Concrete Footing), - Execution Of Earthworks, - Planting Of The Area, - Construction Of A Layer Of Cement-Stabilized Soil - Rm=2.5Mpa Gr. 20 Cm, - Making A Layer Of Cement-Stabilized Soil - Rm = 2.5Mpa Thick. 10 Cm, - Execution Of The Basic Foundation Layer Of Crushed Aggregates 0/31.5 Mm C90/3 Gr. 20 Cm, - Construction Of The Road Surface, Sewage From Micro-Faceted Concrete Paving Stones. 8 Cm Of Gray Color On A Cement-Sand Ballast, - Laying Inrun Curbs 15X22x100, Concrete Stops 12X25x100, Concrete Edges 30X8x100, - Construction Of A Concrete Footing For Curbs, Concrete Stops And Gutter, - Making A Base Of Lean Concrete C8/10 Gr. 15 Cm On Slopes, - Slopes Made Of Graphite-Colored Micro-Faceted Concrete Cubes. 8 Cm, - Vertical Adjustment Of Valve Wells For Water And Gas Valves, Sanitary Vacuum Sewage, Sewer Manholes And Telecommunications Wells, - Covering Of Telecommunication Cables With Arot A Ps 110-160
|