1. The Subject Of The Order Is: Reconstruction Of The Municipal Road Ul. Kolarska In Ostrów Mazowiecka.2.Scope Of The Order:1) The Scope Of The Order Includes In Particular: Basic Parameters:A) Road Category - Municipal Roadb) Road Technical Class - Lc) Traffic Category - Kr3d) Design Speed - Vp = 30 Km/H (In The Development Area)E) Road Length - Approx. 220 Mf) Cross-Section - 2.0 X 2.5 Mg) Road Width - 5.0 M2) Structures Of The Designed Surfaces: A) Roadway; Wearing Course: Concrete Cubes - Thickness 8 Cm, B) Cement And Sand Bedding – Thickness. 4 Cm, C) Base Base Made Of Unbound Mixture 0/31.5 – Gr. 25 Cmd) Auxiliary Foundation Made Of Cement-Stabilized Soil - Thickness 15 Cm, Frame Made Of A Concrete Curb 15X30 Cm On A Concrete Bench With A Support, Concrete Support 12X25cm Sidewalk Surface Structure: A) Concrete Cubes - Thickness. 8 Cm, B) Cement-Sand Bedding – Thickness. 4 Cm, C) Base Base Made Of Unbound Mixture 0.31.5 - Gr. 15 Cm, D) Auxiliary Foundation Made Of Cement-Stabilized Soil, Thickness. 15 Cm Surface Structure Of The Elevated Pedestrian Crossing: A) Concrete Cubes - Concrete Cubes - Thickness. 8 Cmb) Cement And Sand Bedding – Thickness. 4 Cmc) Base Base Made Of Unbound Mixture 0/31.5 - Gr. 35 Cmd) Auxiliary Foundation Made Of Soil Stabilized With Cement Thickness. 15 Cm Construction Of Exits And Parking Spaces: A) Concrete Cubes - Thickness. 8 Cmb) Cement And Sand Bedding - Thickness. 4 Cmc) Base Base Made Of Unbound Mixture 0/31.5 – Gr. 25 Cmd) Auxiliary Foundation Made Of Cement-Stabilized Soil - Thickness 15 Cm Drainage: A) As Part Of The Construction Of A Closed Storm Sewage System, Reconstruction Of The Existing Collective Collector Is Planned, Along With Its Extension Towards The Railway Tracks And Its Inclusion In The D1 Well In Sportowa Street On The Existing Kd500 Canal. B) Complete Drainage System Shown In The Design Documentation.3.The Detailed Scope Of Works To Be Carried Out Is Specified In The Design Documentation And Certificate No. Ab.6743.6.107.2026, Ab.6743.1.270.2026 Of October 13, 2026. 4. It Is Recommended That The Contractor Check The Attached Documentation And Make A Local Inspection Of The Construction Site And Its Surroundings, And Also Obtain, At His Own Responsibility And Risk, Any Additional Information That May Be Necessary To Preparation Of The Offer, Conclusion Of The Contract And Execution Of The Order. The Costs Of Inspecting The Construction Site Will Be Borne By The Contractor.5.Before Commencing The Works, The Contractor Is Obliged To Introduce Traffic Organization For The Duration Of The Works In The Road Area, In Accordance With A Separate Project, Agreed And Approved By The Relevant Authorities. Temporary Markings And Accompanying Permanent Vertical Markings Must Be Maintained In Appropriate Condition Throughout The Works.6.The Ordering Party Will Provide The Construction Site For The Above-Mentioned. Street From The Date Of Handover Of The Work Site. This Means That The Contractor Will Hav
Contact Information
Address
City Of Ostrów Mazowiecka,Ostrów Mazowiecka,07-300,Mazowieckie,Pl924 - Ostrołęcki
Contact No.
296795433
Email
zzp@ostrowmaz.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120943394
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.