|
The Subject Of The Order Is The Reconstruction Of An Internal Road In Doły, Plot No. 120. The Scope Of The Investment Includes: - Sprinkling The Surface With Asphalt - 2,150 M2, - Surfaces Made Of Mineral-Bituminous Mixtures (Wearing Layer), Asphalt Mixture, Thickness After Compaction 5 Cm, Grit Mass, Car Up To 5 Tons - 2,150 M2, X. 1.25,- Surfaces Made Of Mineral-Bituminous Mixtures (Binding Layer), Asphalt Mixture, Thickness After Compaction 3 Cm, Crushed Stone Mass, Car Up To 5 Tons - 1,790 M2, - Mechanical Preparation Of The Area, With Motor Graders, Soil Of Category Iv, Cutting Of Roadsides - 700 M2, - Substructures Made Of Crushed Aggregates, Upper Layer, After Compaction 8 Cm, Adding Roadsides - 700 M2, - Sewage From Concrete Elements, Sand Bedding, Prefabricated Element 20 Cm Deep - Renovation Of Existing Ditches Reinforcement - 300 M, - Pass-Through Parts Made Of Pvc Pipes, Single-Hole Tubular Road Culverts, Fi 40 Cm Pipes, Renovation Of Existing 6 Pcs, 5 M Each - 30 M, - Aggregate Bases Crushed Stones, Lower Layer, After Compaction 25 Cm - 1,330 M2, - Substructures Made Of Crushed Aggregates, Upper Layer, After Compaction 15 Cm - 2,030 M2, - Earthworks Performed With Backhoe Excavators, With Transport Of Excavated Material By Self-Unloading Vehicles Up To 1 Km, Excavator 0.25 M3, Soil Category Iii Desilting Of Ditches - 70 M3. A Detailed Description Of The Subject Of The Order Is Provided In The Design Documentation.
|