|
Bids Are invited for Custom Bid For Services - Assistance Of Manpower For Day To Day Mechanical Works Of E& ;M Section At Dhoptala Oc Mine Sasti Sub Area Of Ballarpur Area - Loading And Unloading Ht/Lt Pump Set From Various Locations To The Field.(In 8 Hours – 1 Job) , On Bed Plate Alignment With Installation Pontoon Pump Sets, Fitting Of Bolts Jointing Of Suction Pipes Foot Valves Bends Delivery Pieces, Nr Valves, Sluice Valve, Cable Pieces, Cable Supporting And Hose Pipe Supporting Etc.(2 Shifts – 01 Job) , Loading, Unloading, Transportation Of Ms Angles, Channels, Gi Sheets To The Site, Pit Digging Erection Of Channels Making Structure And Fixing Gi Sheets.(In 8 Hours – 10 Sq. Mtr) , Taking Out Of Pump Sets Includes Dismantling Of Suction Pipes, Bends, Foot Valves, Delivery Pipe Pieces, Bends, Sluice Valve And Non-Return Valve Etc. Disconnection And Removal Of The Cable Pieces, Transportation To The Safe Prepared Site In The Field.(2 Shifts – 01 Job) , Pump Suction Extension/ Reduction/ Dismantling Of 8 Dia Suction Pipe, Taking Out Foot Valve, Cleaning/Repairing Alignment And Refitting.(In 8 Hours – 2 Jobs) , Dismantling And Fitting Of 8 Dia Flexible Hose Pipe Including Dismantling Of Pipes Shifting, Handling And Laying And Fixing Of Empty Barrel (Floating Arrangement With Proper Alignment And Support) And Complete The Delivery Pipe Line In The Sump.(In 8 Hours – 2 Jobs) , Shifting Of Hdpi Pipe Including, Dismantling, Laying And Water Tight Joint With Proper Alignment And Support.(In 8 Hours -100 Mtr) , Collecting Of Old & Used Pontoons From Field To Repair Site Or Aws And Loading, Unloading, Transportation From The Repair Site/ To Pumping Site.(In 8 Hours – 1 Job) , Transportation Of Pontoon From The Repair Site And Installation In The Sumps.(In 8 Hours – 1 Job) , Dismantling, Loading, Unloading And Transportation Of Old And Used Pontoons From Sumps.(In 8Hours- 1Job) , Removal Of Baby Pontoons From Sumps. (In 8 Hours – 1 Job) , Transportation Including Loading/ Unloading (With Departmental Truck) Of Ms Angle / Rs Joist / Pipe Pole / Ms Rail / Ms Channel / Tor Steel, Etc ( In 8 Hours - 1600 Kg) , Dismantling Of 8 Ms Pipeline In Coal Face (In 8 Hours - 90 M) , Loading, Unloading & Transportation Of 8 Ms Pipe Line To The Working Site With Help Of Departmental Truck (In 8 Hours - 150 Meter) , Spreading,Laying & Jointing Of 8 Ms Pipe Including Inserting Of Rubber/Belt Joints With Suitable Nut Bolts (In 8 Hours - 90 Meter) , Pit Digging & Taking Out 8 Pipe (In 8 Hours - 50 Meter) , Dismantling Of 6Ms Pipe Line From Old Site (In 8 Hours - 90 Meter) , Loading, Unloading & Transportation Of 6 Ms Pipe Line To The Working Site With Help Of Departmental Truck (In 8 Hours - 150 Meter) , Spreading,Laying & Jointing Of 6 Ms Pipe Including Inserting Of Rubber/Belt Joints With Suitable Nut Bolts (In 8 Hours - 90 Meter) , Loading Of 12 Pipe Line To The Truck From Area Store To Unloading At Mines Workshop For Welding Purpose (In 8 Hours - 120 Meter) , Loading, Unloading & Transportation Of 12 Ms Pipe Line To The Working Site With Help Of Departmental Truck (In 8 Hours - 120 Meter) , Spreading,Laying Of Proper Alignment Of 12 Ms Pipe To The Working Site (In 8 Hours - 120 Meter) , Jointing Of 12Ms Pipe Fixing Of Rubber Joints For Proper Tightening Of Bolts (In 8 Hours - 120 Meter) , Carriage Of All Kinds Store Materials From Regional Store To Unit Store By Companys Truck Including Loading, Unloading And Stacking The Same As Per Instruction Of Store In-Charge. ( Applicable For Both Oc And Ug Mines) , Loading, Unloading & Transportation Of 10 Ms Pipe Line To The Working Site With Help Of Departmental Truck (In 8 Hours - 120 Meter) , Spreading,Laying,Jointing Of 10 Ms Pipe With Packing And Nut Bolts (In 8 Hours – 120 Meter)
|