Bids Are invited for Bill Of Quantities Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 - Title1 - Supplying Installation Testing And Commissioning Of Following Capacity Air Cooled Screw Chiller Complete With Vfd (Variable Frequency Drive) Minimum Bee 4 Star Labelling And Complying To Technical Specifications As Mentioned In The Nit A) 150 Tr Bee 4 Star Rated , Title2 - Dismantling Of The Existing Old Chiller From Its Existing Location Including All Necessary Cutting Bending Breaking Of Existing Support Structures To The Chiller Provision Of All Necessary Tools And Tackles I C Hydra Jackhammer Dg Sets Manpower Etc And Shifting It To Nearest Store As Per Direction Of Engineer In Charge , Title3 - Modification Of The Existing Structures Cold Water Pipelines Structural Works For Placement Of The New Chiller On Existing Foundation As Required As Per The Direction Of Eic , Title4 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Butterfly Valve Size 200Mm Nb , Title5 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Butterfly Valve Size 125Mm Nb , Title6 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Balancing Valve Size 125Mm Nb , Title7 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Non Return Valve Check Valvesize 200Mm Nb , Title8 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Y Strainersize 200Mm Nb , Title9 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Pressure Gauge , Title10 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Thermometer , Title11 - Supply Installation Testing And Commissioning Of The Following Chilled Water And Condenser Water Line Valves With Flanges Bolts Nuts Gaskets And All Other Accessories Etc All Complete With Insulation Interconnected To Chillers Pumps Ahus Water Flow Switch
Contact Information
Address
700052,New International Cargo Terminal, Kolkata Airport, Kolkata
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120907629
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.