1. The Subject Of The Order Includes The Performance Of Comprehensive Construction Works Based On The Design Documentation Entitled: Construction Of Słoneczna Street In Rożental.2.The Ordering Party Reserves The Right To Invalidate The Ongoing Tender Procedure Or Withdraw From Signing The Contract With The Selected Contractor In The Event Of Failure To Receive Funds From The Government Road Development Fund.3.A Detailed Description Of The Subject Of The Order Is Set Out In Annex No. 5 To Swz.4.The Task Includes The Following Works: 1) Earthworks - Leveling The Area, Excavations For The Planned Networks 2) Construction Of Road Lighting 3) Construction Of Road Drainage With A Retention Reservoir 4) Securing The Existing Power And Telecommunications Networks With Protective Pipes 5) Earthworks - Backfilling Of Excavations, Leveling The Area 6) Construction Of A Road Surface5.Scopes Of Individual Industries: Road Industrysłoneczna Street: - Construction Of A Road With A Surface Made Of Concrete Cubes. 8 Cm, Including Exits To Private Properties; - Construction Of Concrete Retainers Limiting The Road; - Construction Of A Service Road Made Of Concrete Cubes Around The Retention Tank; - Construction Of Speed Bumps; Sanitary Industry The Road Is Drained Using A Designed Rainwater Drainage System Made Of Pvc Pipes Dn315-400-500 With An Outlet To A Tight Retention Tank, With An Overflow To The Existing Rainwater Drainage System. Concrete Wells With An Internal Diameter Of Ø1200 Are Designed Along The Sewerage Route. A Tight Retention Reservoir With Slopes On The Water Side With A Slope Of 1:2-1:3, Reinforced With A 5.0 M Wide Mesh-Stone Mattress, Supported At The Bottom On A 50*50 Cm Mesh-Stone Basket, Placed On A 10 Cm Thick Sand Bed On Geotextile. Industry Power Engineering - Construction Of Road Lightingthe Investment Includes The Construction Of Road Lighting By Installing Poles With Led Fixtures Powered From The Existing Network. The Designed Lighting Poles Are Round, Galvanized Steel (Outside And Inside), With A Thickness Of Min. 4 Mm. Telecommunications Industry - Construction Of A Technological Channel. The Investment Does Not Include The Construction Of A Technological Channel. 6. The Contractors Obligations Will Also Include: 1) Providing Surveying Services For The Entire Construction Process; 2) Securing The Works During The Construction Period. 3) Preparing And Implementing A Project For The Temporary Traffic Organization And Securing The Works During The Construction Period, And Then Obtaining Its Approval By The Relevant Road Management And Traffic Management Authority; 4) Proper Security Of The Construction Site Along With The Delivery And Operation Of All Temporary Safety Devices Such As: Barriers, Barriers, Warning Lights, Handrails, Fences, Etc., Thus Ensuring The Safety Of Vehicles And Pedestrians. 5) After Completion Of The Works, Tidying Up The Area, Repairing Any Damage And Possibly Paying Appropriate Compensation To The Owners For In
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120895404
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.