|
Central-Heating Installation Work - Major Repair And Reconstruction Of A Storage Room In The Natural Gas Boiler Installation, Located On The Installation Floor In Block 7 And Block 8 In Umbal Sveta Marina Ead, Varna, Reconstruction Of An Elevator Shaft In A Chimney Body, Reconstruction Of An Existing Subscriber Station In Block 4 And A Gas Pipeline Deviation From A Site Gas Pipeline In Pi With Identifier 10135.2555.2677. The Object Of The Public Procurement Is Construction Within The Meaning Of Art. 3, Para. 1, Item 1 Of The Public Procurement Act (Ppa). The Total Estimated Value Of A Public Procurement With The Subject: Major Repair And Reconstruction Of A Storage Room In The Natural Gas Boiler Installation, Located On The Installation Floor In Block 7 And Block 8 In Umbal Sveta Marina Ead, The City Of Varna, Reconstruction Of An Elevator Shaft In A Chimney Body, Reconstruction Of An Existing Subscriber Station In Block 4 And A Gas Pipeline Deviation From A Site Gas Pipeline In Pi With Identifier 10135.2555.2677, Located In Upi I-330 For A Health Care Complex - Mbal, Storey Garage And Trp, Quarter 9, According To The Plan Of The 23Rd M.R., Locality Sotira, City Of Varna, Municipality Of Varna, Blvd. Hristo Smirnenski No. 1, Is Eur 2,426,017.69 Excluding Vat, With 10% Of Costs For Additional And/Or New Activities Arising During The Construction. 7 And Block 8 In Umbal Sveta Marina Ead, Varna, Reconstruction Of An Elevator Shaft In A Chimney Body, Reconstruction Of An Existing Subscriber Station In Block 4 And A Gas Pipeline Deviation From A Site Gas Pipeline In Pi With Identifier 10135.2555.2677, Located In Upi I-330 For A Health Care Complex - Mbal, Multi-Storey Garage And Trp, Quarter 9, On The Plan Of The 23Rd Masters Degree, Locality Sotira, City Of Varna, Municipality Of Varna, Blvd. Hristo Smirnenski No. 1, Is Eur 2,426,017.69 Excluding Vat, With 10% Costs Included For Additional And/Or Unforeseen And/Or New Activities That Occurred During The Execution Of The Construction. Additional Activities, The Need For Which Arose During The Execution Of The Order And Represent An Increase In The Quantities (Volume) Provided For In The Csc For A Given Type Of Work Or Are A New Type Of Activities Not Included In The Csc, But Are Objectively Necessary For The Performance Of The Subject Of The Order - The Cost/S Of These Additional Activities Will Be Up To 10% (Ten Percent) Of The Total Price Proposed By The Participant For The Execution Of The Order, Formed According To The Csc. In View Of The Specifics Of The Construction Site, The Contracting Authority May (But Is Not Obliged To) Assign Additional/Unforeseen Activities Within The Scope Of Up To 10% Of The Value Proposed By The Participant For The Execution Of The Construction Site According To The Bill Of Quantities. Additional/Unforeseen Activities Should Be Understood As The Execution Of Additional Quantities Or New Types Of Construction And Installation Activities, The Need For Which Arose During The Execution Of The Contract, And The Same Are Not Included In The Bill Of Quantities Of The Construction Site, As Of The Date Of The Announcement Of The Public Procurement Procedure. The Terms And Procedure For Awarding Additional/Contingent
|