1. The Subject Of The Order Is: The Construction Of A Selective Municipal Waste Collection Point, Where Municipal Waste Delivered By Residents Will Be Collected And Stored, And Accompanying Activities Will Be Carried Out, E.G. Educational Activities. The Comprehensive Pszok Will Be Located In Starczanowo. The Investment Is A Key Response To The Identified Needs Of The Commune In Terms Of Improving The Waste Management System. Nekla Commune. The Investment Will Be Carried Out In The Town Of Starczanowo, On Plots 19/18* And 19/21, To Which The Commune. Nekla Holds The Legal Title. The Location Is Covered By The Local Development Plan (Resolution No. Xxx/214/2017 Of The City Council Of October 5, 2017). *The Ordering Party Informs About The Division Of Plot Number 19/18. (Appendix No. 9 To Swz). The Area Has Access To A Public Road (Municipal Ul. Do Nekielki). The Project Obtained A Certificate From The Regional Directorate For Environmental Protection In Poznań (No. Wpn-I.6335.406.2025.Zk Of October 15, 2025), Confirming The Lack Of Negative Impact On The Nearest Natura 2000 Area - Dolina Cybiny (Plh300038), Approximately 1.7 Km Away. Scope Of Work: - Construction Works - Construction Of A Paved Maneuvering Area (Approx. 1,622 M2), Sidewalk (Approx. 264 M2) And A Complete Panel Fence Of The Area With A Length Of Approx. 280 M With An Entrance Gate (Approx. 6 M); - Cubic Facilities - Shelters Will Be Built Over Containers With A Total Area Of Approx. 233 M2, A Warehouse For Hazardous Waste (Approx. 33 M2) And Weee (Approx. 33 M2), The Drugie Życie Warehouse Things With A Workshop For Preparing Items For Reuse (Second Life Of Things) With An Area Of Approx. 30 M2 And A Social And Office Container (Approx. 30 M2); - Equipment - A Truck Scale With A Capacity Of Min. 40 T And A Complete Set Of Containers And Bins, Including Kp12, Kp7, 1.1 M3 And 240 L. The Subject Of The Order Must Be Performed In Accordance With The Requirements Contained In The Functional And Utility Program.2.The Subject Of The Order Will Be Implemented In Two Stages: I. - Design Stage (Includes Preparation Of Design Documentation, Obtaining The Arrangements And Decisions Required By Law And Obtaining A Building Permit). Ii - Stage Of Implementation Of Construction Works, Their Completion.3.The Contractor Is Obliged To Design, Obtain All Necessary Consents, Build And Equip The Pszok In Accordance With The Pfu Constituting The Description Of The Subject Of The Order, Taking Into Account The Planned Purpose And Function Of The Project, In Accordance With The Requirements Of Generally Applicable Law (Including Local Law), Standards And Technical Knowledge And Construction Practice. The Contractor Will Be Obliged To Obtain The Necessary Opinions, Arrangements, Technical Conditions, Consents And Decisions, As Well As To Equip The Point With All Necessary Containers, Containers, Tools, Horizontal And Vertical Markings And Construction Facilities.4. The Construction Of The Selective Municip
Contact Information
Address
Gmina Nekla,Nekla,62-330,Wielkopolskie,Pl414 - Koniński
Contact No.
614386011
Email
m.kamel@gminanekla.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120865896
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.