Irrigation Of The Pitch In Koniecznie - Construction Of A Water Intake For The Irrigation Of The Sports Pitch In Koniecznie. The Contractor Will Perform All Necessary Work For The Proper Execution Of The Subject Of The Order, Including Commissioning Of Equipment And Training Of The Users Employees. The Work Should Be Performed In Accordance With The Tender Documentation And In Consultation With The Ordering Party. In Addition, The Scope Of Work Includes: 1) Preparation Of Full Documentation - 2 Copies In Polish, Which Consists Of: A) As-Built Documentation: B) Material Approvals And Prefabricated Elements, C) Instructions For Use, Maintenance And Operation Of Devices2) Work Acceptance Protocols.3) Required Documents Regarding The Tests, Measurements And Checks Carried Out By The Contractor, Work Execution Technology: Work Related To The Implementation Of The Investment Should Be Carried Out In Accordance With Applicable Standards, Construction Law, Legal Provisions Regarding Technical Requirements, Protection Of The Natural Environment, In Accordance With Occupational Health And Safety Rules And Technical Knowledge. All Materials Used Must Have Appropriate Approvals And Certificates And Be In Accordance With Applicable Norms. In Addition, Each Material Used Must Be Agreed With The Ordering Party, Failure To Agree On The Above Will Result In Replacement With An Appropriate One, The Cost Of Replacement Being Fully Borne By The Contractor. If The Contractor Does Not Comply With The Order, The Ordering Party Will Commission The Above Activities To Be Performed By A Third Party And Will Deduct The Costs Incurred By The Contractor From The Contractors Remuneration, And If This Amount Turns Out To Be Insufficient, It Will Be Refunded On General Terms. If The Bill Of Quantities Or Specification Contains Material Indications Of A Specific Manufacturer/Names Of Producers And Products, They Should Be Read As Examples Serving Only To Specify The Subject Of The Order. The Ordering Party Allows The Use Of Materials, Solutions, Technologies. And Equivalent Standards With Technical, Construction And Operational Parameters Not Worse Than Those Assumed In The Technical Specification For The Execution And Acceptance Of Construction Works And Design Documentation. The Ordering Party Requires The Submission Of Appropriate Documents Authenticating These Materials. The Contractor, On Its Own Responsibility And At Its Own Expense, Should Take All Preventive Measures Required By Reliable Construction Practice And Current Circumstances To Secure The Rights Of Owners Of Properties Adjacent To The Notice No. 2026/Bzp 00506762 Of 2026-10-282026-10-28 Public Procurement Bulletin Contract Notice - The Contract Is Awarded In The Basic Mode On The Basis Of: Art. 275 Point 1 Of The Act - Construction Works At The Construction Site/Works And Avoid Causing Any Disturbances Or Damage There. The Contractor Is Responsible For Any Damage Resulting From The Implementation Of The Subject
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120865882
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.