|
1. The Subject Of The Order Is The Construction Of A Main Water Supply Network From The Sołtysko Water Intake To The Water Supply At Ul. Młynowa In Mrągowo.2.A Detailed Description Of The Subject Of The Order Is Included In Annex No. 9 To Swz.3.The Order Is Implemented As Part Of The Project: Project No. Fenx.02.05-Iw.01.0160/24 Project Name. Improving The Reliability And Security Of Water Supply For The City Of Mrągowo.4.The Contractor Will Provide A Quality Guarantee For The Subject Of The Contract For A Period Of At Least 36 Months.5.The Subject Of The Order Also Includes The Performance, Within The Offer Price, Of All Auxiliary And Accompanying Works As Well As Temporary Works Necessary For The Proper Implementation Of The Subject Of The Order For Each Part Of The Order, And In Particular: 1) Execution Or Acquisition On Its Own And Incurring The Costs Of: A) Arrangements, Opinions, Decisions, Analyses, Tests, Etc., Necessary For The Execution Of The Order B) Projects For Changing The Traffic Organization For The Duration Of The Works, Obtaining The Necessary Opinions Of The Authorities, Approval Of The Project By The Traffic Management Authority, C) Geodetic Inventory As-Built, D) As-Built Documentation With Changes Made During Construction, Confirmed By The Designer, Construction Manager And Supervision Inspector, E) Measurements, Tests And Checks That Are Necessary To Perform The Subject Of The Order, F) Other Studies, Works And Tests Required In The Design Documentation.2) Surveying And Geological Services During The Implementation Of Design Works And Construction Works And Incurring Related Costs,3) Organization, Development, Maintenance And Liquidation Construction Site And Incurring The Related Costs, Including Keeping The Roads On Which Construction Vehicles Operate Clean. 4) Notifying The Owners Or Managers Of Utilities, Roads, And Property Owners About The Planned Date Of Commencement Of The Works And The Planned Date Of Their Completion In Order To Carry Out The Acceptance, 5) Obtaining All Opinions, Arrangements And Permits Necessary To Complete The Subject Of The Order And Putting It Into Use, Together With Incurring The Related Costs, Including In Particular Permission To Drain Water From The Drainage Of Excavations, 6) Removal Of Excess Soil Or Transport Of Soil Together With Its Purchase, If Necessary, Possible Replacement Of Soil Or Its Compaction,7) Constructing Control Trenches And Making Possible Spacers In The Event Of A Collision With Existing Utilities,8) Maintaining The Construction Site Free From Traffic Obstacles And Removing Unnecessary Materials, Waste And Garbage On An Ongoing Basis, As Well As Incurring Related Costs,9) Pumping Water From Excavations And Incurring Related Costs,10) Preparing An Application For A Permit To Carry Out Works In The Right-Of-Way And Placing Technical Infrastructure Not Related To The Needs Of Road Management Or Road Traffic, Obtaining A Decision Authorizing The Occupation Of The Right-
|