The Subject Of The Order Is The Implementation Of The Project: Purchase And Installation Of Energy Storage Facilities For The Residents Of The Mykanów Commune Consisting In The Design, Delivery And Implementation (Installation) Of 4 Energy Storage Installations Along With A System For Integrating Existing Pv Installations With Energy Storage And With An Energy Management System In These Installations For Residential Buildings In The Mykanów Commune (Users Beneficiaries). The Project Purchase And Installation Of Energy Storage Facilities For The Inhabitants Of The Mykanów Commune Is Implemented Under The European Funds For Silesia Program For 2021-2027, Priority Fesl.02 European Funds For Green Development, Measure Fesl.02.06 Renewable Energy Sources. Order Description: The Subject Of The Order Includes The Design And Installation Of Energy Storage Installations Along With A System For Integrating Existing Pv Installations With Energy Storage And With An Energy Management System In These Installations For Residential Buildings In Quantities Consistent With Table No. 1. The Project Envisages The Implementation Of 4 Intelligent Systems For Managing And Monitoring Energy Production From Res. Energy Management Software Will Be Installed Together With The Systems. The Purchased Warehouse Will Be Covered By Service And Warranty At Least During The Project Durability Period. The Contractor Will Prepare A Work Acceptance Report With A Tabular List Of The Created Warehouses, With Information About The Location And The Energy Storage Solution Used, Capacity And Serial Numbers. The Contractor Is Obliged To Mark The Installed Devices With Information Stickers As Part Of The Project In Accordance With The Guidelines And An Information Board Regarding The Program In Question - 1 Pc. Stickers. 2. The Detailed Scope Of Design And Implementation Guidelines And The Scope Of Technical Requirements Are Specified In Annex No. 8 To The Swz - Functional And Utility Program (Hereinafter Referred To As Ffu). 3. The Ordering Party Does Not Plan To Organize An On-Site Visit For Contractors And Does Not Require The Submission Of An Offer After An On-Site Visit Or Verification Of Documents, As Referred To In Art. 131 Section 2 Of The Public Procurement Law. 4. The Contractor Will Perform The Necessary Checks/Expert Opinions And Provide Appropriate Details Of The Model Documentation For Individual Installations, Based On Its Own Findings. Based On The Description Of The Subject Of The Order, Including Appropriately Detailed Documentation, The Contractor Will Obtain The Necessary Permits, Make The Required Arrangements, And Obtain The Required Administrative Or Technical Consents, If Necessary. Then, Using Its Own Materials, The Contractor Will Assemble The Installation, Which Means That It Will Deliver All The Necessary Installation Elements To The Site Of The Planned Installation, Assemble Them And Connect Them To The Existing Building Installations, Perform The Required Chec
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120865421
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.