Gatesville ISD - Gatesville Intermediate Roof Repair RE-BID Follow Solicitation .Gatesville Independent School District Is Soliciting Proposals From Qualified Contractors To Provide Labor, Supervision, Equipment, Tools, And Incidental Materials Necessary For The Roof Repair At The Intermediate Campus. The Original Intermediate Roof Project And The High School Addendum From The Original Bid Have Been Included As 1 In This Re-Bid Packet. The Project Generally Consists Of The Following: Specifications For Intermediate Roof Repair. Clear Area Of Debris And Remove All Gravel Throughout The Entire Roof Area To Be Replaced. Install 1 Layer Of 2.5” Iso Board Or Equivalent Throughout The Entire Area Of Roof Per Manufacturer Specifications With All Necessary Fasteners And Plates. Thickness May Need To Be Altered ToWhat The Hvac Curbs Will Allow Height Wise To Ensure Proper Drainage To Roof Drains And No Ponding Water. If The Curbs Need To Be Raised It Will Be Under The Roofing Contractor To Incorporate This Into Their Bid. Also, The Gas Line Height May Need To Be Raised To Accommodate The Needed Height For The Insulation And Proper Drainage. This Also Will Fall To The Contractors Scope Of Work And Cost. Install 60 Mil Gaf- Tpo Or Equivalent, Throughout The Entire Area Of The Roof Per Manufacturers Specifications. 89,600 Square Feet Including Fall Off, Will Wrap Walls Encapsulating Interior Wall Parapets And Securing Perimeter Of Tpo With Termination Bar At Wall Flashing Throughout The Entire Roof. Weld All Seams To Manufacturer Specifications And Probe Once All Seams Are Cooled. Install Necessary Patches At Crossing Seams Install Proper Pipe Boots And Penetration Details For Any Existing Penetrations In The Roof. Inspect That All Materials Are Installed Per Manufacturer Specifications. Clean Up All Debris Related To Roof Work. Include All Costs For Needed Equipment, Labor Disposal And Materials To Complete The Job. Include Warranty Information As Applicable To Installed Materials. Specifications For High School Roof Repair. Clear Area Of Debris And Remove All Gravel Throughout The Entire Roof Area To Be Replaced. Install 1 Layer Of 2.5” Iso Board Or Equivalent Throughout The Entire Area Of Roof Per Manufacturer Specifications With All Necessary Fasteners And Plates. Thickness May Need To Be Altered ToWhat The Hvac Curbs Will Allow Height Wise To Ensure Proper Drainage To Roof Drains And No Ponding Water. If The Curbs Need To Be Raised It Will Be Under The Roofing Contractor To Incorporate This Into Their Bid. Also, The Gas Line Height May Need To Be Raised To Accommodate The Needed Height For The Insulation And Proper Drainage. This Also Will Fall To The Contractors Scope Of Work And Cost. Install 60 Mil Gaf- Tpo Or Equivalent, Throughout The Entire Area Of The Roof Per Manufacturers Specifications. 896.5 Square Feet Including Fall Off, Will Wrap Walls Encapsulating Interior Wall Parapets And Securing Perimeter Of Tpo With Termination Bar At Wall Flashing Throughout The Entire Roof. Weld All Seams To Manufacturer Specifications And Probe Once All Seams Are Cooled. Install Necessary Patches At Crossing Seams Install Proper Pipe Boots And Penetration Details For Any Existing Penetrations In The Roof. Inspect That All Materials Are Installed Per Manufacturer Specifications. Clean Up All Debris Related To Roof Work. Include All Costs For Needed Equipment, Labor Disposal And Materials To Complete The Job. Include Warranty Information As Applicable To Installed Materials.91473-Roofing And Siding;
Contact Information
Contact Person
Leighann Goodwin
Contact No.
2548657152
Email
Lgoodwin@Gatesvilleisd.Org
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120864675
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.