|
The Subject Of The Order Is The Modernization Of Vacant Buildings Owned By The Housing Management Company - Renovation Of Residential Premises, Divided Into Tasks: Task No. 1: Residential Premises At Ul. Żurawiaj 7B/2 Scope Of The Subject Matter Of The Order: 1. General Construction Works: 1) Demolition Works: A) Forging Steel And Wooden Door Frames Out Of The Wall, B) Dismantling External And Internal Doors, C) Dismantling Walls Made Of Bricks, Full Thickness Of ½ Brick, D) Covering Loose Internal Plasters On Walls And Ceilings, E) Dismantling Curtain Rods, Hangers, Clothes Dryer Etc., F) Carving Out Ventilation Grilles And Doors From The Wall, G) Tearing Off Old Wallpapers, H) Dismantling Wooden Floors And Wall Strips. 2) Flooring And Cladding Works: A) Preparation Of The Subfloor, Removal Of Uneven Surfaces Of Walls And Floors, Moisture-Proof Insulation, Bituminous Coatings On Walls And Floors, B) Installation Of Self-Leveling Floors, C) Installation Of Stoneware Tile Floors Stoneware, D) Facing The Walls With Stoneware Tiles, E) Making Floors With Floor Panels, Note: The Floors Should Be Made So That The Level Is The Same In All Rooms. 3) Bricklaying And Plastering Works: A) Bricking Up The Recess In The Room, Bricking Up And Moving The Door Opening From The Hall To The Kitchen, B) Building Thick Partition Walls. 12 Cm Of Lime-Sand Blocks Related To The Extension Of The Bathroom Towards The Kitchen And Hall, C) Casing Of The Water And Sewage Pipe Made Of Plasterboards, D) Making New Plasters On The Walls, E) Supplementing The Plasters On The Walls And Ceilings, 4) Painting Works: A) Preparing The Surface For Painting - Removing Cracks, Cleaning, Washing, Re-Filling The Surface, B) Applying A Plaster Plaster On Walls And Ceilings,C) Painting Walls And Ceilings With Emulsion Paints,D) Cleaning Works After Painting Works.5) Door Joinery:A) Delivery And Installation Of Door Frames And Interior Door Leaves (Including Bathroom Doors With An Air Intake Grille),6) Finishing Works (Kitchen Equipment):A) Delivery And Installation Of A Cabinet With A Sink,B) Installation Of Ventilation Grilles In Kitchen And Bathroom, 2. Installation Works: 1) Sanitary Installations: A) Disassembly Of The Existing Water And Sewage Installation, B) Disassembly Of Bathroom Fittings, Washbasins, Toilet Bowls, C) Installation Of Plastic Cold And Hot Water Pipelines, D) Installation Of Valves For The Water Supply System (Through, Non-Return), E) Installation Of Pvc Sewage Systems, F) Installation Of Pipeline Insulation, G) Flushing Of The Installation, H) Test Tightness Of The Water And Sewage Installation, I) Delivery And Installation Of Bathroom And Kitchen Fittings, J) Delivery And Installation Of A Shower Tray With A Cabin (Minimum Width 80 Cm), K) Delivery And Installation Of A Washbasin (Minimum Width 70 Cm), Compact Toilet Bowl, 2) Electrical Installation: A) Disassembly Of Electrical Installation Equipment, B) Cutting Grooves And Laying Electrical Installation Cables
|