Tenders Are Invited For Construction Of The Orlik 2025 Sports Complex In Białka, Radzyń Podlaski Commune As ... in Poland
Tender Notice
TenderID
120860465
Tender Brief
Tenders Are Invited For Construction Of The Orlik 2025 Sports Complex In Białka, Radzyń Podlaski Commune As Part Of The Orlik Sports Complex Construction Program - 2025 Edition
Construction Of The Orlik 2025 Sports Complex In Białka, Commune. Radzyn Podlaski” As Part Of The Orlik Sports Complex Construction Program - 2025 Edition 4.1.1 The Scope Of Work Includes: - Construction Of Locker And Sanitary Facilities, - Construction Of A Football Pitch With The Necessary Infrastructure (Drainage, Fencing, Lighting), - Construction Of A Multi-Functional Pitch With The Necessary Infrastructure (Drainage, Fencing, Lighting), - Installation Of Small Architecture, Including Benches, Baskets For Garbage, Bicycle Racks, - Construction Of Hardening 4.1.2 A Detailed Description Of The Subject Of The Order Can Be Found In Annex No. 7 To The Swz (Documentation). It Consists Of The Following Documents: 1) Technical Design (Electrical, Sanitary, Construction, Architectural) 2) Land Development Design 3) Stwiorb 4) Bill Of Quantities 5) Decisions, Permits Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation Referred To In Point 4.1.2. The Bill Of Quantities Is Of An Auxiliary Nature. In Each Case, During The Implementation Of The Contract, The Occurrence Of Works Not Included In The Bill Of Quantities Or Of Works In A Larger Quantity Than Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation Referred To In Point 4.1.2. Technical Specifications And Technical Reference Systems Referred To In Article 101, Section 1, Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent4.1.3 Basic Requirements: A) The Warranty Period For The Completed Subject Of The Contract Must Be At Least 36 Months, Counted From The Date Of Final Acceptance. Xvii Of This Tor B) The Contractor May Not Take Advantage Of Any Obvious Errors Or Omissions In The Design Documentation. If The Contractor Detects Such Errors Or Omissions, It Will Immediately Notify The Ordering Party, Who Will Make The Necessary Changes Or Additions. C) Failure To Report Errors Referred To In Point B) Means That The Contractor Accepts The Bills Of Quantities And Technical Documentation And, By Submitting The Offer, Undertakes To Achieve The Effect Of Implementing The Public Procurement Contract Which Is The Subject Of This Documentation, Expected By The Ordering Party. In Such A Situation, The Contractor Cannot Make Any Claims To The Ordering Party In This Respect. D) The Bill Of Quantities Is An Auxiliary Material For Preparing The Calculation Of The Offer Price And It Is Attached To The Swz Solely To Facilitate The Contractors Calculation Of The Offer Price. The Employer Acknowledges That The Contractor Has Taken Into Account All Requirements And Obligations, Whether Stated Or Implied, Contained In All Parts Of The Design Documentation. The Offer Price Must Include
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120860465
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.