|
Road Construction Works – Black Pump Industrial Park; Extension South 5 North; Lot 3 - Infrastructural Development; Areas Eq 2,3,4. Rough Quantities / Scope: Traffic Facilities: 5500 M2 Dismantling Of Existing Construction Road, 2100 M2 Production/Dismantling Of Construction Road, 800 M2 Dismantling Of Paved Areas, 8400 M3 Of Excavated Soil, 11,700 M2 Of Subgrade, 4700 M3 Of Frost Protection Layer, 8850 M2 Of Asphalt Paving, 3200 M2 Of Shoulder, 1510 M2 Infiltration Trough, Marking, Signage Building Constructions: Pipe Structure For Access South 5 (38 M3 Of Reinforced Concrete), Pipe Structure For Access To The Childrens Forest (27 M3 Of Reinforced Concrete), 2255 M Of Fencing Including Gates, 20 M Of Pipe Railings, 120 M Of Empty Pipes Lighting: New Construction Of Approx. 750 M Of Road-Side Lighting With 18 Light Poles, Incl. Cables, Electricity Distribution Column: New Construction Of Cable Distribution Cabinets With Fuse Strips, Supply Cables Naycwy 4X150/70 Mm² Approx. 600 M; In Open Construction New Construction Of 4 Cable Pull Shafts Along The Road Including Earthworks Pipe Jacking Using Hdd For Naycwy 4X150/70 Approx. 65M Electrical Installation Work For Inlet System, Including Access Control Tk/It: New Construction Of Empty Pipe Association (7X12 Speed Pipe), Along The Road Approx. 700 M, In Open Construction Laying/Blowing In A Fiber Optic Cable Approx. 4000 M, Connection To The Existing Pipe Jacking Using Hdd (For Pipe Assembly 7X12 Speedpipe) Approx. 560M, Connection Of The Inlet System To The Existing System Using An Empty Pipe Assembly (7X12 Speedpipe) Approx. 1200M 1 Cable Pull Shaft Including Earthworks, At Gate 11 The Service Includes Access Control, Camera Monitoring And Expansion Of The Truck Inflow Control (Yard Management). In Addition, There Is The Electrical And Data Technology Equipment As Well As The Development Of An It Container, Including The Necessary Earthworks, Road And Path Work As Well As Testing, Commissioning And Documentation. Water-Carrying Media: Sw: New Construction Of Approx. 530 M S-Channel Dn 200 Pp In Open Construction Including Access Shafts 8 Pcs. Dn 1000 B + 1 Pcs. Dn 1200 B With Gate Valve, 1 Pc. Apw Dn 1500 For 2 Pumps In Wet Installation / Depth Up To 4 M. New Construction Of Approx. 470 M Adl Dn 80 In Open And Closed (Hdd Portion Approx. 150 M, Of Which 70 M In Sr Dn 150) Construction Including Connection To Existing Lot 2 And Ventilation Valve, 2 Pcs. Ha Extensions For Residents And Ha Gatekeeper In Dn 150 Tw: New Construction Of Approx. 910 M Drinking Water Pipe Dn 100 Pe In Open And Closed (Hdd Share Approx. 80 M) Construction Including Connection To The Existing Südstraße With Separating Shaft As Well As To The Existing Lot 2, Pre-Stretching Childrens Forest Dn 100 From The Existing Dn 200 Südstraße, 11 Slide Valves Dn 200 To 80, 1 Underground Hydrant, 2 Ha Pre-Stretching Dn 40 And 1 Dn 25 With Tapping Fitting Fw: New Building Of Approx M Fire Water Pipe Dn 200 Pe In Open And Closed (Hdd Portion Approx. 80 M) Construction Including Connection To Existing Lot 2, 4 Pcs. Surface Hydrants Incl. 4 Pcs. Slide Valves Dn 200. Fw/Saw/Pa Additionally In The Isp/Neue Straße 10 Area: New Building Of Approx. 750 M Fw Dn 250 Pe In Open And Closed Construction Method (Hdd Portion Approx. 280 M, Of Which Approx. 70 M In Sr Dn 350) Including Connection To The Existing Str. K/Neue Str. 10. Another 40 M Of Fw As Feed Into The Existing Protective Pipe Dn 10
|