5.1.The Subject Of The Order Are Construction Works Designed By The Contractor, Consisting In The Design, Delivery, Assembly And Commissioning Of Home Biological Sewage Treatment Plants (Pboś) Meeting The Requirements Of The Pn-En12566-3:+A2:2013 Standard. The Delivered Devices Are To Be Complete, Brand New Products. The Subject Of The Order Will Be Implemented In The Błaszki Commune In The Amount Of 60 Pieces According To The List Constituting An Annex To The Functional And Utility Program.5.2.The Operation Of The Treatment Plant Is Based On Activated Sludge Technology With A Submerged Biological Bed, Which Involves The Treatment Of Sewage By Aerobic Bacteria And Microorganisms, While Intensively Aerating The Sewage. The Ordering Party Does Not Allow A Sewage Treatment Plant With A Settling Tank/Chamber/Pre-Tank In Which Putrefaction Processes Take Place. Aeration Of Sewage In The Treatment Plant Is To Be A Continuous, Forced Process, Without The Possibility Of Automatic Or Manual Control. 5.3.The Scope Of The Order Is Detailed In The Functional And Utility Program Constituting Annex No. 7 To The Swz. 5.4.The Ordering Party Reserves That The Size Of The Order (Number Of Installed Sewage Treatment Plants) May Be Reduced - Up To 5% Of The Entire Scope, Due To The Following Circumstances: A) The Possibility Of Some Residents Resigning From The Construction Of Home Sewage Treatment Plants During The Implementation Of The Task For Reasons Beyond The Ordering Partys Control, B) The Occurrence Of Other Legal Or Technical Circumstances That Objectively Prevent The Execution Of Construction Works Constituting The Subject Of The Order 5.5.In The Cases Referred To In Point 5.4 Letters A) - B) And The Ordering Party Fails To Indicate Another Location, The Order Value Will Be Reduced By The Amount At Which The Treatment Plant Was Valued In Accordance With The Cost Breakdown In The Offer Form. 5.6.Due To The Situation Described In Point 5.4. The Ordering Party Reserves The Right To Indicate Substitute Locations. 5.7.The Entire Investment Task, From Design To Warranty And Operational Acceptance, Should Be Performed Based On The Formal, Legal And Normative Acts In Force In The Country And The Requirements Of The Ordering Party, Specified In The Contract Concluded With The Contractor.5.8.The Works Must Be Designed And Constructed In Accordance With The Requirements Of Applicable Polish Regulations, Standards And Instructions. Failure To Specify Any Applicable Legal Acts In These Requirements Of The Ordering Party Does Not Exempt The Contractor From Their Application. In Justified Cases (Lack Of Polish Regulations), The Use Of Current European Union Standards Is Allowed. 5.9.The Contractor Is Obliged To Carry Out The Works In Accordance With The Design Of The Sewage Treatment Plant And The Organization Of Safe Work, The Bioz Plan And The Occupational Risk Assessment, Developed On Its Own (Based On The Pfu). 5/10.The Treatment Plants Are Required To Have Full Test
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120772471
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.