The Task In Question Involves The Construction Of A Municipal Road - Graniczna Street On The Section From The Intersection With Ul. Rejonowa To The Intersection With Ul. Short (Including The Intersection). A Bitumen Road Was Designed For Ul. Graniczna, 6.00 M Wide, With Individual Entrances. On The Northern Side, A Sidewalk With A Width Of Min. 2.30 M Connecting Through The Designed Pedestrian Crossing With The Existing Sidewalk In Ul. District. The Slopes Were Designed To Be 6.00 M Wide With 1.5 M X 1.5 M Slopes Or Appropriate Curves. The End Of The Street Construction Will Result In Its Integration Into Krótka Street With The Edges Rounded With An Arc Of R = 9.0 M. The Length Of The Fragment Of The Road Under Construction Will Be Approximately 490 M. The Height Of The Street Will Be Adjusted To The Existing Elevations Of The Surrounding Area. Throughout Its Entire Length, It Will Run On The Existing Terrain, Without Any Obvious Embankments/Excavations. As Part Of The Road Construction, A Technological Channel Will Be Constructed. It Will Be Made Along The Lighting Supply Line, Which Is The Road Managers Internal Network. The Channel Will Consist Of A Dn 110 Casing Pipe, Three 40/3.7 Fiber Optic Pipes And One Prefabricated Micropipe Bundle. The Road Will Be Drained Using Storm Inlets And Then A Storm Sewage System. The Water Receiver Will Be A Drainage Ditch Located On The Western Side Of The Road. It Will Be Built Into A 800 Mm Pipeline Along The Entire Length Of The Investment. A Pumping Station Will Be Built Near The Water Discharge Site. The Planned Street Will Be Fully Lit (Road, Sidewalk). For This Purpose, A New Lighting Route Will Be Marked Out, Which Will Include Lighting Poles With Fixtures, A Cable Line And The Required Technical Equipment. As Part Of The Electrical Works, Power Will Also Be Provided To The Planned Rainwater Pumping Station. The Construction Of The Road Requires Partial Demolition Of Conflicting Individual Fences And Allotment Garden Fences. A Significant Part Of The Vegetation In The Study Area Is Located In The Designed Lines Separating The Street. Graniczna. The Location Of The Trees Means That They Must Be Removed Due To Their Collision With The Planned Road And Technical Infrastructure. The Designed Road Is An Access Road To The Property And Connected To Municipal And District Roads - Ul. Krótka And Ul. District. It Is Planned To Build A Municipal Road With An Access Road Class And A Designed Speed Of 30 Km/H. The Road Is Designed For Traffic Category Kr2. Number Of Traffic Lanes On The Road - 2. The 6.0-Wide Road Will Be Made Of Bituminous Layers. The Sidewalk And Road Exits Will Be Made Of Concrete Cubes. As Part Of The Subject Of The Order, The Contractor Is Also Obliged To Submit, On Behalf Of The Ordering Party, A Report On The Completion Of The Works To The District Construction Supervision Inspectorate In Piaseczno (Or Apply For A Decision On The Use Of The Road).
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120718781
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.