The Subject Of The Order Is The Renovation Of The Internal Electrical Installation Of Wlz With Connection To Apartments, Replacement Of Collective Boards Of Existing Measuring Systems In The Staircase, Replacement Of Main Switchboards In Corridors, Residential Boards, Lighting Installation In Common Areas Of Adm And Installation Of Lighting And 230V Sockets With 400V Power Installation In Residential Premises In A Multi-Family Residential Building In Oborniki Śląskie At Ul. Podzamcze 7. The Works Include The Installation Of Common Areas:• Internal Power Lines• Main Switchboard And Floor Switchboards, Including Measurement Systems And Changes To The Administrative Switchboard• Basic Lighting Of Common Parts Of Communications On Floors And In The Basement• External Lighting At The Entrances To The Building• Main Equalizing Connections• Fire Protection Power Switch (Uw Pwp)• And, In Addition, In 17 Residential Premises:• Replacement Of Switchboards• Installation Of Sockets (Including Power Supply For 7Kw Cookers) And Lighting Premises The Works Include The Execution Of Electrical Construction Works Together With The Delivery Of All Materials, Devices And Equipment Necessary To Perform The Order And Obtain Full Efficiency Of The Installation In The Building Subject To Modernization. The Works Should Be Performed In Accordance With Applicable Legal Regulations, Principles Of Technical Knowledge, Technical Conditions For The Execution And Acceptance Of Construction Works And The Requirements Of The Manufacturers Of The Materials And Devices Used. The Bill Of Quantities Is An Auxiliary Document Used To Determine The Material Scope Of The Order. The Contractor Is Obliged To Include In The Offer Price All Works, Materials, Devices And Activities Necessary For The Proper Execution Of The Subject Of The Order, Even If They Are Not Explicitly Mentioned In The Bill Of Quantities, But Result From The Technology Of Work Execution, Applicable Regulations Or Principles Of Technical Knowledge. Electrical Construction Works In Common Areas• Replacement Of Switchboards With New Ones • Construction Of New Installation Circuits, • Installation Of Lighting • Installation Of Fire Protection Switches • Installation Of Internal And External Led Lighting Fixtures (Motion Sensors) In Accordance With The Requirements Of The Pn-En Standard 12464-1:2022*• Execution Of Main Equipotential Connections, • Performance Of Electrical Measurements And Preparation Of Reports. Electrical Construction Works In The Premises• Replacement Of Switchgears With New Ones • Installation Of Sockets (Including Power Supply For Induction Cookers) • Execution Of Lighting Installations Finishing Construction Works Throughout The Building• Filling Of Floors And Restoring Them To Their Pre-Renovation Condition• Filling Of Wall Grooves With Plaster, Leveling With Putty, Priming, Painting Worksall Works Should Be Performed Based On The Following Documents: • Architectural And Construction Design Entitled
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120712082
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.