|
1. The Subject Of The Order Is The Ongoing Renovation Of Roads, Sidewalks And Markings In The Road Lane Of City Streets In The City Of Lubawa In 2027. The List Of Streets Covered By The Works That Are The Subject Of The Order Is Attached As Appendix No. 10 To The Swz. A Detailed Description Of The Subject Of The Order In This Procedure Is Included In The Specification Of Order Terms, Sst And Bills Of Quantities (Annex No. 9 To Swz), And The Contract Template With Annexes.2.In The Technical Specification For The Execution And Acceptance Of Works, The Ordering Party Has Defined Quality Standards That Refer To All Important Features Of The Subject Of The Order.3.The Scope Of Work Includes Renovations In The Following Areas: 1) Dirt Roads (Paved And Unpaved): A) Profiling And Repair Using A Grader And Rubber Roller, B) Profiling And Repair Using An Excavator, C) Mechanical Construction Of The Roadbed Along With Soil Removal, D) Renovation Of The Surface With Road Crushed Stone, E) Laying Of Road Slabs.2) Roads With Asphalt And Concrete Surface: A) Renovation Of Streets With Asphalt Mass On Hot With Asphalt Cutting And Caving With A Steel Roller, B) Street Renovations With Cold Asphalt Mass And Cutting Asphalt Together With Caving With A Steel Roller, C) Street Renovations With Hot Asphalt Mass Without Cutting Asphalt And Caving With A Steel Roller, D) Street Renovations With Cold Asphalt Mass Without Cutting Asphalt And Caving With A Steel Roller, E) Resurfacing Roads Made Of Cobblestones,F) Street Renovations With A Concrete Mix,G) Replacement Of Road Curbs,H) Laying Of Road Slabs,I) Pouring Of Concrete,J) Planing Of Roadside Surfaces.3) Sidewalks:A) Laying Of A Sidewalk Made Of Pol-Cobblestones, Together With A Sidewalk Edge,B) Laying A Sidewalk Made Of Paving Slabs, Together With A Sidewalk Edge,C) Relocation Of A Sidewalk Made Of Concrete Slabs,D) Relocation Sidewalk Made Of Pol-Cobblestones,E) Relocation Of The Sidewalk Made Of Stone Slabs,F) Relocation Of The Sidewalk Made Of Stone Blocks,G) Relocation Of The Sidewalk Made Of Trylinka,H) Relocation Of Concrete Edges.4) Vertical Road Markings: A) Straightening Road Signs, B) Installing New Vertical Markings.5) Horizontal Road Markings - Painting Horizontal Markings On The Road.6) Other Works Related To The Road: A) Regulation Sewage Wells, B) Arrangement Of The Storm Sewage System.4.The Contractor Is Obliged To Inspect The Technical Condition Of Vertical Signs, Sidewalks And Roads In The City At Least Once A Month, In Accordance With The Street List (Appendix No. 10 To Swz). If Any Irregularities Are Found, The Contractor Informs The Ordering Party About It.5.The Contractor Performs The Work And Purchases New Signage In Agreement And Upon Written Order Of The Employer.6.The Contractor Shall Perform Works At Each Request Of The Ordering Party, Within A Time Limit Not Longer Than That Agreed With The Ordering Party, And The Deadline For Carrying Out Repairs In The Event Of An Emergency Notificatio
|