Accumulators, Primary Cells And Primary Batteries – Turnkey Construction (Epc) Of A Grid-Connected Battery Storage System. Energiespeicher Soltau I Gmbh Plans To Build And Operate A Grid-Connected Stand-Alone Battery Storage System (Battery Energy Storage System – Bess) At The Soltau Location (Harburger Straße, In The Immediate Vicinity Of The Soltau Substation). The Aim Of The Project Is To Realize A Powerful, Economical And Bankable Storage System With A Planned Connected Load In The Performance Class Of 10 To 12.5 Mw. The System Is Designed For A Technical Service Life Of At Least 15 Years And Must Be Designed In Such A Way That The Commercial Revenue Potential During Ongoing Operation Is Not Limited By Avoidable Technical Restrictions. The Bess Serves To Provide A Wide Range Of Energy And Grid-Related Services. The Technical Design Of The System Components, The Power Electronics And The Energy Management System (Ems) Must Enable Flexible Multi-Use Operation, Especially For: - Balancing Energy Markets - Spot And Intraday Trading - Network-Serving Services The Client Intends To Commission An Experienced General Contractor Based On An Epc Contract Model (Engineering, Procurement And Construction). The Contractor Is Responsible For The Turnkey Planning, Delivery, Construction, Electrical Connection, Testing And Commissioning Of The Bess, Including All Services Required For Immediate, Safety-Related And Contractual Commercial Operation.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120702264
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.