1. The Subject Of The Order Is: Construction Of The Wałcz - Strączno Bicycle Path Along With The Development Of Recreational Areas.2. The Order Is Co-Financed Under The Project No. Fepz.07.01-Iz.00-0014/26 Entitled Construction Of The Wałcz - Strączno Bicycle Path Along With The Development Of Recreational Areas Under The European Funds For Western Pomerania 2021-2027 Program From The European Regional Development Fund.3. The Subject Of The Order Is The Implementation Of Construction Works On The Task Titled: Reconstruction Of The Road Strip Of National Road No. 22, Consisting In The Construction Of A Bicycle Road With A Service Channel, Lighting And Drainage Installation, In The Strip Of National Road No. 22, On The Section From Km 160+800 To Km 164+1004. The Contract For Construction Works Will Be Concluded Between The Contractor And The Wałcz Commune And The Wałcz Commune. 5. The Investment In Question Involves The Construction Of A Section Of A Bicycle Path Along National Road No. 22 Between The Towns Of Strączno And Wałcz6. All Construction Works Should Be Carried Out In Accordance With The Construction Design, Which Is A Detailed Description Of The Subject Of The Contract Entitled: Reconstruction Of The Road And Related Facilities, Consisting In The Construction Of A Bicycle Path With A Service Channel, Installation Of Street Lighting And Drainage In The Road Area Of National Road No. 22 In Connection With The Investment Entitled: Construction Of A Bicycle Road Along The National Road Dk22, On The Section From The Town Of Strączno - The End Of The Existing Sidewalk, At The Height Of Plot No. 115/1 (Km 160+800 Sp) To The Pedestrian Crossing At The Entrance To Cos Bukowina - Road, Bridge, Electrical And Telecommunications Industries - Annex No. 3 To Swz. 7. On The Bicycle Path Under Construction, A Road Has Been Designed With An Asphalt Surface, 2.5 M Wide, With 0.30 M Wide Shoulders, With A One-Sided Transverse Inclination Of 2.0% Along Its Entire Length, Limited By Concrete Retainers. The Existing Exits Are Scheduled For Reconstruction.8. As Part Of The Construction, Existing Bus Stops Will Be Rebuilt And A Platform Will Be Constructed. At Km Approx. 1+800 To Approx. 1+900, A 3.0 M Wide Pedestrian And Bicycle Path Will Be Constructed.9. External Lighting For The Bicycle Path Has Been Designed Along The Entire Length Of The Bicycle Path, As Well As Additional Lighting For The Suggested Pedestrian Crossing At Km ̴ 1+806 Ddr.10. Reconstruction Of Existing Road Culverts That Interfere With The Planned Bicycle Path Is Planned.11. The Culverts On The Colliding Section Will Be Dismantled And Connected To The Drainage Ditches By Strengthening Them With A Concrete Settling Tank According To Kped 01.14, Inserted Into The Dn1000 Inlet Well, Which Will Be Connected To The Dn2000 Collecting Well, Connected To The Existing Culvert. Retaining Walls Will Be Constructed At The Culvert Entrances.12. Drainage Is Carried Out On The Surface By Ensuring Appropri
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120673918
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.