Scaffolding Work – Scaffolding Work. Facade Scaffolding, Load Class 4, W09, Assembly/Dismantling, Transfer / 1200 M² Facade Scaffolding, Load Class 4, W09, Transfer For Use Via Gz / 38,528 M²/Week Facade Scaffolding, Internal Deck Widening, 0.30 M, / 509 M Facade Scaffolding, Fall Protection, Internal Railing / 245 M Room Scaffolding, Load Class 4, Assembly/Dismantling, Transfer / 2,214 M³ Room Scaffolding, Load Class 4, Transfer For Use Via Gz / 25,222M³/Week Room Scaffolding, Load Class 3, Assembly/Dismantling, Transfer / 801 M³ Room Scaffolding, Load Class 4, Transfer For Use Via Gz / 623 M³/Week Articulated Telescopic Lift, Working Height 9.00 M, Reserve / 30 Hrs/Week Scissor Lift, Working Height 9.00 M, Reserve / 30 Hrs/Week Articulated Telescopic Crawler Platform, Working Height 20.00 M, Reserve / 30 Hrs/Week Material, Passenger Lift, 2000 Kg, Assembly/Dismantling, Provision / 2 Hrs. Material, Passenger Elevator, Transfer Of Use Etc. Gz / 122 Hrs/Week Material And Passenger Lift, 500 Kg, Assembly/Dismantling, Provision / 1 Pc. Material And Passenger Elevator, 500 Kg, Transfer For Use Above. Gz
|