Building Construction Work - Renovation Of St. István Martyr Church Ii. Beat. The Papal Exterior Renovation Of The Church Of St. István The Martyr, Construction And Execution Phase Ii As Detailed Below And In The Public Procurement Documents: - Complete Renovation Of The Churchs Facade (Tower Pair And Main Facade, Church Nave, Sanctuary And Oratories Facades), Of Which The Plastered Surface: 3294.24 M2 In Total - Renovation Of The Tower Helmets - Repair Of The Entire Roof Surface (Tiling) Of The Church In Total: 1,520 M2 (Nave, Sanctuary) - Renovation Of The Entire Roof Surface (Tin) Of The Roofs Above Side Rooms (Oratories) And Between The Towers: 280 M2 - Renovation And Restoration Of Windows And Doors With Stone Frames, Iron Structures And Hardware, In Total: 11 Pcs (1 Main Entrance Double-Wing Door, 2 Single-Wing And 1 Double-Wing Door Overhead Lighting With Window, 1 Two-Wing Door, 1 Sacristy Door, 1 Crypt Door, 4 Tower Windows) Planned Technical Interventions: Facade Renovation - Complete Facade Scaffolding (Including Tower Helmets) - Plastering Of Facades, Repair Of Plaster - Painting Of Facades - Renovation Of External Doors And Windows (Doors, Tower Windows) (See Restoration Tasks) Renovation Of Roof Coverings - Nave And Sanctuary Repair Of The Tile Covering - Renovation Of The Flat Plate Covering Of The Nave - Removal Of The Covering Of The Drawer Roofs Between The Oratories And The Towers, Repair Of The Carpentry Structures And Preparation Of The Scratched Plate Covering - Repair Of The Copper Covering Of The Tower Helmets - Creation Of Horizontal Eaves, Placement Of Vertical Rain Channels Lightning Protection: - Relocation Of The Connecting Conductors On The Roof Level To The Structure Under The Roof - Construction Of Planned Lightning Protection Additions On The Roof Level - New Construction Of Lightning Arresters Roof-Level Support Elements Electrical Works - Installation Of Church Main Distribution Equipment And Main Facade Distributor - Construction Of Sacristy And Main Facade Distribution Intermediate Cabling - Construction And Commissioning Of Lighting Control System - Construction Of Electrical Tracks Sunk Into The Facade (Etching, Placement Of Basic Wires) - Installation, Installation And Installation Of External Lighting Fixtures Designed On Facades And Construction Of Cabling - For Entrances Manufacture And Installation Of Individual Wall Arms Lightning Protection: – Temporary Dismantling And Re-Installation Of The Existing Lightning Protection Of The Tower Helmets And Placement Of The Lightning Arrester Wire Up To Grounding – Placement Of New Lightning Protection Conductors On The Nave, Creation Of Grounding Restoration Tasks – Painting Restoration Supervision During The Facade Renovation Based On A Stone Restoration Plan: – Facade Stone Elements (Portico, Stone Frames Of Doors And Tower Windows, Stone Pillars, Carved Architectural Sections, Statues, Coat Of Arms, Entrance Stairs) Restoration Based On A Wooden Restoration Plan: – Renovation Of The Wooden Windows Of Towers – Renovation Of Entrance And Armor Plate Doors Based On A Metal Restoration Plan: – Renovation Of The Wrought Iron Grilles Of The Doors And Windows – Renovation Of The Dials And Pointers Of The Tower Clock, Placing Them With The Connecting Mechanism And The Electrical Connection Towards The Control – Renovation Of Top Decorations – East Tower Gargoyle
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120631937
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.