|
Bids Are invited for Mobilization - Mobilization And Demobilization Of All Necessary Drilling Equipment, Machinery, Tools, Materials, Manpower And Personnel To And From The Project Site, Including Transportation, Loading, Unloading, Shifting And Removal Of The Drilling And Associated Equipment Complete In All Respects (Bore Hole Location As Per Site Plan Attached In Ps) , Jungle Clearance - Jungle Clearance And Preparation Of Approach Or Access To Each Borehole Location Including Removal Of Minor Vegetation And Site Obstructionism Preparation Of A Suitable Working Platform As Required, Shifting Of The Drilling Rig To The Designate Borehole Locations And Fixing, Positioning Leveling And Erection Of The Drilling Reg, Complete In All Respects. , Lab Tests - Conducting The Relevant Labtest, As Per The Applicable Is Sand Project Requirements, On The Soil And Rock Samples Collected During The Field Investigation, Including Sample Preparation, Testing, Calculations And Reporting Of Test Results Preparation And Submission Of Comprehensive Geotechnical Investigation Report Containing Complete Records Of The Field Investigations, Boreholes, Locks, Spt Results, Soil And Rocks Samples Details, Lab Test Report Relevant Calculations, Analysis Interpretation Of Subsurface Conditions, Conclusions And Geotechnical Recommendations, Duly Completed And Presented In A Clear And Systematic Manner Complete In All Respects. , Earthwork - Working Out Of Earthwork Calculation Cutting, Filling, With Approved Earth In The Proposed 20.85 Acres Site To Achieve The Required Formation Levels As Directed By Engr-In-Charge, Data Obtain From Existing Topographical Sheet, Level Sheet And & Contour Map Including All Leads, Lifts, Labor, Machinery And Incidental Works Complete In All Respects As Directed. , Vetting Of Geotechnical Investigation Report - Vetting Of The Geotechnical Investigations Report And Earth Work Calculation By An Authorized And Competent Institution Agency, Such As Iit, Nit And Andhra University Including Review Of The Field Investigation Data Boreholes Logs, Spt Results, Laboratory Test Results, Geotechnical Analysis Interpretation, Conclusions And Recommendation And Incorporation Of Observations/Comments, If Any, Lairing From The Vetting Process Complete In All Respects , Drilling Of Nx Diameter - Drilling Of Nx Diameter Boreholes Through Soil By Rotary Drilling Method, Including Conducting Standard Penetration Test Spt At 1.5Meter Intervals And Collection Of Disturbed Soil Samples Ds, Continuing Until Any One Of The Fwg Termination Criteria Is Met Whichever Occurs First, Sptn Value Less Than 100 Is Obtained At Three Consecutive Depths, Or 3 Mrs Of Rock Is Encountered Or A Max Depth Of 8M In Soils Reached
|