1. The Subject Of The Order Is. Reconstruction Of The Ground Floor And First Floor Of The Building At Ul. Okopowa 21/27 In Gdańsk – Stage 3.2.The Subject Of The Order Specified In Section 1 Includes, Among Others: - Reconstruction Of Two Mens Sanitary Rooms, - Reconstruction Of A Womens Sanitary Room, - Reconstruction Of A Sanitary Room Intended For People With Disabilities, - Reconstruction Of A Social Room, - Reconstruction Of A Security Room/Porters Office, - Construction Of A Stone Floor In The Communication Route, - Performance Of Necessary Accompanying And Reconstruction Works Related To The Implementation Of The Above Scope. A Detailed Description Of The Subject Of The Order Is Specified In The Description Of The Subject Of The Order Constituting Annex No. 1 To The Swz, Annexes No. 1.1 - 1.2 To The Swz And In The Draft Contract Constituting Annex No. 2 To The Swz.3.The Subject Of The Contract Will Be Implemented In Three Stages: Stage I - First Floor Of The Building: Comprehensive Reconstruction Of One Room Of The Mens Toilet Located On The First Floor Of The Building. The Scope Of Works Includes In Particular: A) Securing The Rebuilt Room And Adjacent Areas; B) Dismantling The Existing Equipment And Elements Intended For Replacement; C) Performing The Necessary Preparatory And Demolition Works; D) Constructing Or Modernizing Sanitary, Water Supply And Sewage Installations To The Extent Necessary For Proper Functioning Of The Room;E) Carrying Out The Necessary Electrical Works;F) Preparing The Substrates And Making New Wall And Floor Coverings;G) Performing Painting And Finishing Works;H) Installing Sanitary Fittings And Bathroom Equipment;I) Tidying Up The Room And Preparing It For Use. Stage Ii - Ground Floor Of The Building: The Scope Of Works Includes In Particular: A) Reconstruction Of The Security/Porters Room; B) Reconstruction Of The Second Room Of The Mens Toilet, Located On Ground Floor Of The Building;C) Construction Of A New Stone Floor In The Passageway On The Ground Floor Of The Building;D) Performance Of Necessary Accompanying, Reconstruction And Finishing Works;E) Coordination Of Construction Works With Parallel Works Related To Strengthening The Security Systems Of The Facility, Including In Particular The Intruder Alarm System (Sswin), Access Control (Ac), Closed Circuit Television System (Cctv) And Fire Protection Systems (Poż.). Stage Iii - Sanitary And Social Rooms: The Scope Of Works Includes In Particular: A) Reconstruction Of A Womens Sanitary Room; B) Reconstruction Of A Sanitary Room Intended For People With Disabilities; C) Reconstruction Of A Social Room. The Scope Of Works Includes The Necessary Demolition, Installation, Sanitary, Electrical, Construction And Finishing Works, As Well As The Delivery And Installation Of Equipment Provided For In The Order Documentation. In A Sanitary Room Intended For People With Disabilities With Disabilities, Solutions Should Be Used To Ensure That It Can Be Used By People Wit
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120448465
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.