The Subject Of The Order In Part I Are Construction Works As Part Of The Task Modernization Of Infrastructure For Water Intake And Distribution In The Puławy Commune. The Scope Of The Order Includes, Among Others: Includes: Part I: Modernization Of The Water Intake Together With The Water Treatment Plant In Góra Puławska And Cleaning Of Tanks For The Wwtp In Gołębie A) Replacement Of 2 Existing Deep-Well Pumps With A Depression Probe And Line (Pressure) Pipes; B) Reconstruction Of The Casings Of 2 Existing Deep Wells; C) Replacement Of All Water Meters In The Deep Wells And In The Wwtp Building With Water Meters Ultrasonic;D) Replacement Of 2 Hydrophore Sets;E) Installation Of Additional Water Disinfection (Uv Lamp) On The Wwtp;F) Renovation, Repair And Sealing Of 2 Expansion Tanks, Replacement Of Supporting Steel Structures Of Working Platforms And Ladders, Air Vents, Stairs, Implementation Of Moisture-Proof Insulation On The Tank Slab, Replacement Of Manhole Covers, Replacement Of Balustrades;G) Washing And Cleaning Of The Rinsing Water Tank Along With Hydrophobization Of The Slab Covering;H) Reconstruction And Replacement Of Power Supply, Control And Signaling Cabling And Modernization Of Switchboards Along With The Implementation Of A Reactive Power Compensation System.I) Installation Of Software For The Suw Operation Monitoring System;J) Delivery And Installation Of A Power Generator;K) Expansion Of The Existing Photovoltaic Installation;L) Construction Of A Cctv Installation, M) Implementation Of Led Lighting;N) Insulation Of The Plinth Of The Suw Building Along With Insulation, Installation Of A Band Around Building, Replacement Of The External Door And Replacement Of The Soffit; O) Demolition Of The Existing Fence And Construction Of A New One; P) Cleaning Of The Interior Of Two Above-Ground Steel Tanks For The Wwtp In Gołębie, Each With A Capacity Of 100 M³, Along With Anti-Corrosion Protection. The Scope Of Work And The Contractors Responsibility Within The Scope Of The Proposed Offer Price Also Includes: 1) Organization And Development Of The Construction Site; 2) Marking And Securing The Works Performed And Ensuring Safety At Construction Site; 3) Preparation And Submission, On Behalf Of The Ordering Party, To The Relevant Distribution System Operator Of Updated Data Regarding The Photovoltaic Installation And Notification To The Competent State Fire Service Authority About The Completion Of Installation And Commencement Of Use Of Pv Devices, Along With A Plan Of The Photovoltaic Device For Rescue Teams. Confirmation Of These Activities Constitutes Part Of The Acceptance Documentation; 4) Organizing And Carrying Out The Necessary Tests, Examinations And Acceptances, As Well As Possible Supplementation Of The Acceptance Documentation For The Scope Of Works Covered By The Subject Of The Order; 5) Provision Of Surveying Services By Authorized Surveying Services, Including Field Marking And As-Built Inventory; 6) Ensuring And Bearing The
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120423014
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.