Tenders Are Invited For Construction Of A Regular Exit From Dw No. 957, Section 100 Km 8+000.00 To Plot No. ... in Poland
Tender Notice
TenderID
120355932
Tender Brief
Tenders Are Invited For Construction Of A Regular Exit From Dw No. 957, Section 100 Km 8+000.00 To Plot No. 1065 Along With The Liquidation Of The Exit, Section 100 Km 8+040.00 In The Town Of Jabłonka Procedure Repeated
1. The Subject Of The Order Includes The Task Entitled: Construction Of A Regular Exit From Dw No. 957, Section 100 Km 8+000.00 To Plot No. 1065, Together With The Liquidation Of The Exit Section 100 Km 8+040.00 In The Town Of Jabłonka In Accordance With The Requirements Set Out In The Specification Of The Terms Of Order, And In Accordance With The Art Of Construction And Technical Knowledge, Applicable Legal Regulations, In In Particular Technical And Construction, Industry Standards And Pn.2.The Subject Of The Investment Is A Construction Project Consisting In: Construction Of A Regular Exit From Dw No. 957, Section 100 Km 8+000.00 To Plot No. 1065 Along With The Liquidation Of The Exit Section 100 Km 8+040.00 In Jabłonka.2.1. The Scope Of Works Includes: Preparatory Works (Staking Out The Facility), Earthworks (Removal Of The Topsoil Layer, Excavations), Surface Construction (Subbase, Surface Layers) And Finishing Works (Cleaning The Area).2.2. The Scope Of Works Includes In Particular: • Construction Of A Regular Exit From Dw No. 957, Section. 100 Km 8+000.00, For Plot No. 1065• Liquidation Of The Exit From Dw No. 957, Section 100 Km 8+040.00, To Plot No. 1065• Construction Of Markings3. Nomenclature Of The Common Public Procurement Vocabulary (Cpv):45233120-6 - Road Construction Works45111000-8 - Demolition Works, Earthworks45112000-5 - Soil Removal Works45233000-9 - Construction, Foundation And Surface Works Of Highways, Roads45200000-9 - Construction Works In Scope Of Construction Of Complete Buildings Or Their Parts And Works In The Field Of Civil Engineering4. A Detailed Description Of The Subject Of The Order Is Included In The Attachments. Attachment No. 9. Design Documentation. Attachment No. 10. Technical Specification For The Execution And Acceptance Of Construction Works (Stwior). Attachment No. 11. Bill Of Quantities.5.Required Warranty Period: Required Warranty Period For The Construction Works Performed And The Materials Used - Minimum 36 Months - Maximum 60 Months From The Date Of Final Acceptance Of The Works Attention!!! The Ordering Party Informs That The Length Of The Guarantee Provided Is A Criterion For Selecting The Most Advantageous Offer With A Weight Of 40%. The Contractor Who Proposes The Longest Warranty Period, But Not Longer Than 60 Months, Will Receive A Maximum Of 40 Points. While The Contractor Who Proposes The Required Warranty Period (36 Months) Will Receive 0 Points.
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120355932
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.