1. The Subject Of The Order Is The Performance Of Construction Works As Part Of The Task Entitled: Reconstruction Of The Boiler Room At The Public Primary School In Młynisko, Including Relocation Of The Heat Pipeline, In The Town Of Młynisko, Biała Commune, On Plot No. 144, Młynisko Precinct, Next To The Public Primary School.2.The Works Should Be Carried Out In Accordance With The Design Documentation, Stwiorb And The Required Decisions And Arrangements Appropriate For The Investment.3.The Aim Of The Works Is To Replace Coal Technology With A Biomass Boiler Room For Heating And Preparing Hot Water And To Adapt The Accompanying Infrastructure.4.A Detailed Description Of The Subject Of The Order, The Scope Of Works And The Technical And Quality Requirements For The Execution Of The Order Are Specified In The Documents Constituting Annex No. 1 To The Swz, Including In Particular Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb) And Bills Of Quantities.5.The Scope Of The Order Includes In Particular: - Demolition And Dismantling Works Of Existing Coal-Fired Boilers As Well As Equipment And Installations To Be Replaced, - Delivery And Installation Of Two Biomass Boilers With A Capacity Of 80 Kw And 100 Kw, Using Wood Chips As The Primary Fuel And Pellets As A Substitute Fuel, Along With Automation, Fuel Feeding, Cleaning, Ash Removal And Security Systems, In Accordance With The Documentation And Stwiorb, - Installation Of Technological Installations Boiler Rooms, Buffer Tanks, Domestic Hot Water Heaters, Pumps, Fittings, Pipelines And Thermal Insulation As Well As Flue Gas Discharge And Ventilation Systems In The Scope Of Design Documentation, - Expansion And Reconstruction Of The Boiler Room And Adaptation Of The Boiler Hall And The Existing Coal Warehouse For A Wood Chip And Pellet Storage Facility, With Earthworks, Foundations, Construction, Masonry, Roofing And Insulation Works, - Finishing Works And Reconstruction, Including Floors, Plasters, Cladding, Painting, Carpentry And Fire Protection Provided For In The Documentation, - Relocation Of The Heat Pipeline And Construction Of External Central Heating, Hot Water And Water Supply Installations, Along With Earthworks, Pre-Insulated Cables And Reconstruction Of The Area Within The Scope Of The Documentation, - Execution Of Electrical Installations, Power Supply For Devices, Cable Lines, Switchboards, Lighting And Accessories, And Electric Shock Protection In Accordance With The Documentation Industry, - Performing Tightness Tests, Flushing, Adjustments And Commissioning Of The Installation, Electrical Tests And Measurements, As Well As Providing As-Built Documentation, Test Protocols And Operating Instructions.6.The Works Should Be Carried Out While Securing The School Premises And Maintaining Safe Communication. The Organization Of Works And Interruptions In The Supply Of Heat And Water Should Be Agreed With The Ordering Party And The
|