|
1. The Subject Of The Order Is A Comprehensive Energy Modernization Of A Multi-Family Building Along With The Construction And Modernization Of Connections And Water And Sewage Installations In Wojkowice Kościelne At 4 Drogowcy Street In The Siewierz Commune. 2. The Scope Of The Order Is Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works, Specification Of The Terms Of The Contract (Swz) And Includes In Particular: A) Preparation Of The Area For The Implementation Of The Task, B) Measurement And Surveying Works, C) Renovation Of Residential Premises D) Renovation Of External And Internal Joinery And Joinery, E) Renovation Of Basements, F) Renovation Of External Stairs, G) Renovation Of The Staircase, H) Renovation Of The Facade, I) Renovation Of Internal Sanitary Installations, J) Renovation Of Sanitary Installations External,K) Renovation Of The Cold Water Installation,L) Renovation Of The Hot Water Installation,M) Renovation Of The Sanitary Sewage Installation,N) Renovation Of The Heating Installation,O) Renovation Of The Gas Installation,P) External Sanitary Sewage Installation,Q) Installation Of A Tank For Liquid Waste,R) Renovation Of The Electrical Installation,S) Renovation Of The Telecommunications Installation,T) Renovation Of The Lightning Protection Installation,U) Renovation Of The Internal Lighting Installation.2.The Contractor Will Also Be Obliged To: A) Provide Access To Existing Premises. The Works Should Be Secured Taking Into Account The Presence Of Residents. B) Devices And Markings Of The Construction Site And Its Appropriate Security And Ensuring Appropriate Occupational Health And Safety Measures Throughout The Duration Of The Task, C) Performance Of Security And Reconstruction Works, In Accordance With The Correct Technology Of Performing The Works, Including Protection Of The Building Against Atmospheric Precipitation, In The Event Of Damage Occurring As A Result Of Improper Protection Of The Building, The Repair Costs Are Borne By The Contractor Of The Works, D) Performance Of All Accompanying Works, Consistent With The Design And The Correct Technology Of Performance Of The Works, E) Performance Of Any Connections Water Supply And Energy For The Purposes Of Construction And Incurring The Costs Of Utility Consumption (Sub-Meter), F) Incurring Possible Costs Of Turning On And Off Utilities, G) Implementing And Applying In Practice The Provisions Of The Design Of The Organization And Technology Of Works, Taking Into Account Health And Safety Conditions, H) If The Works Require Supervision By Appropriate Managers Of Roads Or Land Infrastructure Networks Or Resulting From Other Arrangements, The Contractor Will Ensure Such Supervision, Also If It Is Paid And Incurs These Fees, I) Carrying Out The Necessary Tests, Tests And Measurements And All Tests, Tests And Measurements At Each Request Of The Employers Representative Or Supervisory Inspectors In Order To Con
|