The Subject Of The Order Are Construction Works Involving The Construction Of Street Lighting In Two Towns In The Kluki Commune Using Modern Energy-Saving Solutions. 1) Part 1 - Construction Of Street Lighting In Kaszewice (On The Section From The Primary School To The Cemetery) The Subject Of The Order Includes The Construction Of A 0.4 Kv Overhead Cable Line For Street Lighting In Kaszewice Commune. Kluki, Plot No. 2385, Precinct 3, Kaszewice Commune. Kluki. The Investment Runs Through Plot No. 2385, District 3, Kaszewice Commune. Kluki. To Be Constructed Is An Overhead Line With Asxsn Type Cables 2X25 Mm2, A Cable Line Type Yakxs 4X25mm2, Concrete Poles Type E 10.5/4.3, 10.5/2.5 With Led Lighting Fixtures On 1.0 M Booms. The Street Lighting Line Should Be Constructed On Designed Poles Placed Directly In The Ground. Select The Layout For Medium-Sized Soil. The Location Of Poles No. L1 To L9 Should Be Made In Accordance With The Land Development Plan. The Poles Should Be Protected In The Part Below The Ground With A Bituminous Layer, Up To The Height Of 35 Cm Of The Protruding Part Of The Pole Above The Ground Level. The Asxsn 2X25mm2 Cable Should Be Installed On The Designed Pole Positions From The Designed Pole No. L0 To The Pole No. L4 And From The L5 Station To The L9 Station. For Installation, Use Pass-Through Holders And Guy Holders Mounted On Hanger Hooks In Accordance With The Applicable Insulated Cable Installation Technology. Connect The Lighting Fixtures Using Branch Terminals Piercing The Insulation, And Use Fuse Connectors With Fuse Inserts To Protect The Fixtures. The Street Lighting Cable Line Should Be Laid From The Designed L4 Pole Position To The L5 Pole. A Brace Should Be Placed Along The Lighting Cable, To Which All Grounding Terminals Should Be Connected. Led Lighting Fixtures With A Power Of 53 W Are Designed, Mounted On 1-Meter Booms. Connections Between The Fixture And The Fuse Connector Should Be Made With A Ydy 3X2.5 Mm2 Cable. The First Level Of Protection Against Atmospheric Overvoltages Will Be Implemented Using Designed Lightning Arresters. Surge Arresters Should Be Installed On The Designed Pole L0, L4, L5, L9 Of The Designed Lighting Line. The Cable Should Be Attached To The Poles With Pole Holders. On Poles Up To A Height Of 2.5 M Above The Ground And 0.5 M Below The Ground Surface, Protect The Cable With A Protective Tube Resistant To Uv Radiation. Attach The Pipe To The Pole Using Dedicated Brackets. The First Level Of Protection Against Atmospheric Overvoltages Should Be Implemented Using Designed Lightning Arresters. In The Places Indicated On The Map, Lay The Cable In A Rigid Hdpe50 And Corrugated Hdpe50 Protective Pipe. The Cable Should Be Laid In A Trench At A Depth Of 70 Cm In A Wavy Line On A 10 Cm Thick Sand Bed. After Laying The Cable And Tape In The Ground, The Installation Should Be Covered With A 10 Cm Thick Layer Of Sand And Marked With Blue Foil. After Laying The Foil, Cover The Trench With A 10 C
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120355907
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.