The Subject Of The Public Order Is The Construction Of A Sewage Pumping Station Csp A Ul. Defenders Of Peace In Celestynów, As Part Of The Investment Project Entitled Construction Of The Csp A Sewage Pumping Station In Celestynów Ul. Obrońców Pokoju, Plot No. 2542. The Scope Of The Order Includes The Demolition Of The Existing Building And The Construction Of A Sanitary Sewage Pumping Station On Plot No. 254 In Celestynów (Csp. A):3. The Following Works Should Be Performed As Part Of The Subject Of The Order: 1) Construction Of A Temporary Sewage Pumping Station (For The Duration Of Construction Works) Ensuring The Discharge Of Sewage From The C.S.P. Catchment Area. A,2) Demolition Of The Existing Sanitary Sewage Pumping Station Building On The Property Marked With Plot No. 254 In The Town Of Celestynów,3) Construction Of A Sewage Pumping Station Building With Equipment And The Necessary Technical Infrastructure On The Property Marked With Plot No. 254 In The Town Of Celestynów,4) Obtaining A Permit To Use The Sewage Pumping Station Building By The District Construction Supervision Inspector In Otwock.4.Construction Works Will Be Carried Out In Accordance With Polish Law, In Particular The Act Of July 7, 1994 - Construction Law (Consolidated Text: Journal Of Laws Of 2026, Item 524), Technical And Construction Regulations, Regulations Regarding Independent Technical Functions In Construction And Regulations Regarding Products And Materials Used In Construction. 5. Operation And Service Of The Temporary Sewage Pumping Station During Construction Works Is The Responsibility Of The Contractor. The Specificity Of The Station Should Be Agreed With The Ordering Party Before Its Delivery.6.Characteristics Of Vacuum Pumps: 1) Type: Oil-Lubricated Vane Pumps, 2) Capacity: 300 M3/H, 3) Nominal Engine Power: 7.5 Kw, 4) Final Pressure (With The Equalizing Valve Open): 0.5 Hpa 5) Vacuum Pumps Should Be Equipped With Soft Start Systems, The So-Called Szr, Shock Absorber Switches And Oil Level Sensors.7.The Automation Of The Central Vacuum Station Should Be Visualized On A 7 Touch Panel And Incorporated Into The Scada System Existing In The Celestynów Commune. The Station Automation Should Be Open With Available Source Code. The Pumping Station Should Be Controlled On-Site (Touch Panel) And Remotely (Via The Scada System). 8. Basic Scope Of Visualization: 1) Vacuum Tank: Pump Status (Operation, Standstill), Current Sewage Level, Value Negative Pressure. Possibility Of Switching On The Pumps, Changing The Settings, Changing The Vacuum Pressure. Changes In The Pump Switching Parameters In Relation To The Sewage Level, 2) Permit For The Use Of The Facility (Operation, Standstill), Oil Level. Possibility Of Switching On The Pumps, Changing The Pump Switching Settings. 9. Otwock.2) As-Built Documentation With Changes Signed By The Construction Manager.3) Completed Construction And Demolition Log. 4) Declaration Of The Construction Manager On The Execution Of The Work
Contact Information
Address
Municipality Of Celestynów,Celestynów,05-430,Mazowieckie,Pl912 - Warszawski Wschodni
Email
zamowienia@celestynow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120355906
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.