1. The Subject Of The Order Is The Construction Of Lighting For The City Park. M. Szubert In Ząbki, Located At The Intersection Of Batorego, Kolejowa And Wojska Polskiego Streets. The Investment Includes Plots No. 6/9, 3/6, 3/13, 6/12, District 0020 (01-20) With A Total Area Of ~2.4 Ha. 2. The Detailed Scope Of Work Includes: A) Construction Of Park Lighting On 4 M High Aluminum Poles With Its Own Concrete Foundation Along With 31 W Rgbw Led Fixtures, Total Quantity - 71 Pcs., B) Construction Of Decorative Park Lighting On 1 M High Poles With 13 W Led Rgbw Fixtures, Total Quantity - 22 Pcs., C) Construction Of Parking Lot Lighting On 6 M High Aluminum Poles With Own Concrete Foundation With Led Rgbw Road Luminaires With A Power Of 26 W, Total Quantity - 4 Pcs, D) Construction Of Lighting For The Playground, Gym And Hill On 6 M High Aluminum Poles With Its Own Concrete Foundation Along With Led Rgbw Road Luminaires With A Power Of 26 W, Total Quantity - 12 Pcs, E) Construction Of Lighting For The Square In Front Of The Monument On 6 M High Aluminum Poles With Its Own Concrete Foundation And Led Lamps Rgbw Type Floodlight With A Power Of 35 W, Total Quantity - 4 Pcs, F) Construction Of Tree Lighting, Rgbw Led Luminaires Of The Ground Projector Type With A Power Of 38 W, Total Quantity - 6 Pcs, G) Construction Of Monument Lighting, Rgbw Led Luminaires Of The Ground Projector Type With A Power Of 11 W, Total Quantity - 2 Pcs, H) Construction Of Flag/Mast Lighting With Rgbw Led Luminaires Of The Ground-Mount Type With A Power Of 16 W, Total Quantity - 3 Pcs, I) Construction Of An Underground Lighting Cable Line Supplying Yakxs 5X16 Mm2 Lighting Fixtures, J) Construction Of An Underground Lighting Cable Line Supplying Yky 3X2.5 Mm2 Lighting Fixtures (Projectors, Eyelets And Posts), K) Construction Of An Underground Lighting Cable Line Supplying Yky 3X6 Mm2 Lighting Fixtures (Ząbki Inscription And Christmas Tree), L) Construction Of An External Lighting Control Switchboard To And A Tz Area Power Supply Switchgear, M) Construction Of Power Supply Switchboards For Technological Devices Tb (2 Pcs.) Along With Yakxs 5X16 Mm2 Power Lines, N) Construction Of A Cable Line Supplying Yky 3X6 Mm2 Charging Points, O) - Construction Of Earthing In The Form Of Galvanized Fe/Zn 4X25 Tape Laid Along The Power Cable And Pins Inserted To A Depth Of Min. 3 M, P) Construction Of A Dali Bit 500 2X2.5 Mm2 Control Cable Line, Q) Notifying Pinb In Wołomin About The Intended Date Of Commencement Of Construction Works, R) Surveying Services For The Construction Site, Including An As-Built Inventory, S) Obtaining A Decision Authorizing The Use Of The Facility.
|