|
The Subject Of The Order Is The Comprehensive Implementation Of The Investment Task Titled: Construction Of Letniskowa Street In Prądocin, Including The Construction Of A Municipal Road With The Necessary Road And Technical Infrastructure As Well As The Execution Of Accompanying Works Necessary For The Proper And Complete Implementation Of The Investment. The Task Also Includes Adapting The Existing Infrastructure To The Designed Road System And Land Development To The Extent Specified In The Design Documentation And Other Procurement Documents. The Scope Of The Order Includes: 1) Preparation Of A Traffic Organization Design For The Duration Of The Works, 2) Introduction Of Temporary Traffic Organization And Protection Of The Works, Including: Marking And Maintenance Of Markings And Securing The Works During The Traffic Organization, 3) Preparatory And Demolition Works, Including The Removal Of Trees (240 Pcs.) And Bushes (25 M2), 4) Reconstruction Of National Road No. 25 (Bydgoska Street) In The Scope Of The Intersection With Letniskowa Street: Roadway - 90 M2, Shoulder - 20 M², Triangular Island - 5 M²,5) Construction Of A Service Channel - 1,757 M,6) Construction Of A Roadway 1,737.3 M Long And 5.5 M Wide With A Kr2 Surface - 11,264 M2.7) Construction Of Exits With A Bituminous Surface - 1,044 M2.8) Construction Of Additional Exits To Plots No. 178/9, 178/6 And 122/121, Prądocin District, Not Covered By The Design Study; The Exits Should Be Made With A Surface Structure Analogous To The Construction Of The Exits Provided For In The Design Documentation, While Maintaining The Construction Layers, Materials And Technical Parameters Specified For The Exits In The Design; The Width Of Each Exit Should Be Assumed To Be 3.5 M,9) Construction Of A Pedestrian And Bicycle Path Made Of Asphalt Concrete - 4,612 M2,10) Construction Of An 80 M Long Sidewalk With A Surface Of 8 Cm Thick Gray Concrete Cubes - 194 M2, 11) Construction Of A Bus Platform At Km Approx. 0+230–0+240, Separated From The Road By A Concrete Curb With Dimensions 15 × 30 × 100 Cm, Raised 12 Cm Above The Road Surface Level, 12) Construction Of A Bus Bay With A Cement Concrete Surface - 131 M2,13) Construction Of Roadsides Made Of Crushed Aggregate, Unbound Aggregate Mixture C90/3 - 2,241 M2,14) Height Regulation Of All Ground Devices Located Within The Road System Under Construction, I.E. Gates And Valves Of The Water Supply Network, Manholes Of Sewage Wells, Energy Boxes,15) Reconstruction Of Power Conflicts Outside The Collision Area And Existing Road Lighting Using Existing Lighting Cabinets And Relocation Of Existing And Adding New Lighting Poles,16) Reconstruction Of Culverts And Drainage Devices Specified In The Water Permit Decision No. Di.Zuz.4210.379.2025,17) Topsoil And Sowing With Grass - 2,184 M2,18) Introduction Of New Signage,19) Planting 261 Trees And 25 M2 Shrubs,20) Reconstruction Of The Brick Fence - 81 M2,21) Finishing And Accompanying Works And As-Built Inventory.
|