1. The Subject Of The Order Is The Design And Implementation (Execution) Of Construction Works Consisting In The Reconstruction Of Spacerowa Street In Ogrodzieniec - In The Design And Build Formula. 2. The Scope Of The Order Has Been Divided Into Two Stages: 1) Stage I - Phase Of Design Works, Which Includes, In Particular, The Preparation Of Complete Design And Cost Estimate Documentation For This Investment, Based On The Pfu, Along With Obtaining The Necessary Administrative Decisions For Its Implementation; 2) Stage Ii - Execution Phase, I.E. Execution Of Construction Works Described In The Prepared Design Documentation And Stwiorb, And Exercising Authors Supervision Over The Implementation Of Construction Works. 3. The Planned Investment Is Located At Ul. Spacerowa In Ogrodzieniec, On Plots No. 4340/5, 5064/4, 5764/1 And 67/33/1, Ogrodzieniec District, Ogrodzieniec Commune4. Assumed Design Parameters: District Road No. 1738Sroad Class Ztraffic Category Kr 3Permissible Load 115Kn/Axlelength Of Section 1 621 M Width Of The Road 6.00 M Width Of The Ground Shoulders On Both Sides 1.00 M Width Of The Two-Way Bicycle Path 2.00 M Fatigue Durability Period 20 Years The Designed Subgrade For The Foundation Of The Road Structure Must Meet The Load-Bearing Criteria G1 5. Adopted Indicators To Be Included In The Design Documentation: Section Length 1,621 M Length Of The Shoulders (Calculated On Both Sides) Sides Of The Road) 1,755 Mlength Of Bicycle Paths (Calculated On Both Sides Of The Road) 1,475 M6. The Design Part Includes In Particular: - Preparation Of An Up-To-Date Map For Design Purposes, - Preparation Of A Multi-Sector Construction Design, - Obtaining A Decision On The Environmental Conditions Of The Project, - Obtaining A Decision Authorizing The Cutting Of Trees, - Preparing Designs For Removing Conflicts Between Technical Infrastructure And The Planned Investment, - Agreeing On Designs For Removing Conflicts With The Owners Of The Infrastructure Technical Infrastructure, - Agreement On The Planned Technical Infrastructure Networks At A Coordination Meeting, - Obtaining A Building Permit Decision Or Effective Notification Of Construction Works That Do Not Require A Building Permit Together With A Certificate, - Preparation And Approval Of A Permanent Traffic Organization Project, - Preparation And Approval Of A Temporary Traffic Organization Project For The Duration Of Construction Works, - Preparation Of Executive Designs, - Preparation Of Technical Specifications For The Execution And Acceptance Of Construction Works, - Preparation Of Bills Of Quantities And Investor Cost Estimates Divided Into Industries, - Service Surveying Of The Investment, - Preparation Of An Inspection Report With A Set Of Required Documents, Including An As-Built Surveying Inventory. 7. The Execution Part Includes In Particular: - Construction Of A Class Z District Road With A Section Length Of Approx. 1,620.91 M. - District Road With An Asphalt Road Surface 6.0 M Wi
Contact Information
Address
District Road Authority In Zawiercie,Zawiercie,42-400,Śląskie,Pl22b - Sosnowiecki
Email
sekretariat@zdp-zawiercie.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120355861
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.