The Subject Of The Order Is The Performance Of Construction Works As Part Of The Investment Titled: Reconstruction Of The Water Treatment Plant In Prusinowice With Accompanying Infrastructure, Located On Parts Of Plots No. 216, 218/9, 295, Unit Or Lutomiersk, Prusinowice District. The Investment Task Concerns The Reconstruction Of The Water Treatment Plant Building, The Construction Of An Additional Water Storage Tank With A Total Capacity Of V = 100 M3, The Construction Of A Neutralizer Tank For Sewage From The Chlorination Plant, The Replacement Of Fittings In Deep Wells Along With The Replacement Of Pumps And Well Pipes, The Construction Of An Additional Underground Tank For Rinsing Water, The Construction Of New Underground Technological Installations - Water Supply, Sewage And Electrical.4.2. Characteristic Parameters Of The Building. The Investment Includes The Reconstruction And Thermal Modernization Of The Water Treatment Station Building And The Construction Of A Shelter For A Power Generator. The Wwc Building Is Single-Story Without A Basement. The Facility Was Designed In A Steel Structure. The Supporting Structure Of The Building Consists Of Brick Walls. Existing External Walls, Insulated With Thick Polystyrene. 10 Cm And Covered With White Or Light Gray Facade Plaster. The Building Is Covered With A Flat Roof With An Inclination Angle Of 8-10°. The Supporting Structure Of The Roof Is Made Of Reinforced Concrete. The Entire Building Is Placed On Strip Foundations. A Shelter For The Power Generator Is Placed On A Foundation Slab. Steel Structure Of The Shelter According To The Structure Design. Covering The Shelter With Trapezoidal Sheet Metal.A) Gross Volume Of The Suw Station - 459.5 M3 Gross Volume Of The Shelter For The Power Generator - 31.9 M3b) Area Summary Water Treatment Station Building: Building Area 89.7 M2 Total Area 89.7 M2 Usable Area Of The Building 65.1 M2 Shelter For The Generator Generator: Building Area 11.3 M2 Total Area 11.3 M2 Usable Building Area 11.3 M2 C) Height, Length, Width: Water Treatment Station Building: Maximum Height Of The Ridge Above Ground Level 6.20 M External Dimensions: 11.1 M (Front Elevation) X 8.08 M Shed For The Generator Set: Maximum Ridge Height Above Ground Level 2.94 M External Dimensions: 4.40 M (Front Elevation) X 2.56 Md) Number Of Floors Water Treatment Plant Building: Single-Story Building Shed For The Power Generator: Single-Story Facility 4.3. Details Regarding The Above-Mentioned Works Can Be Found In The Attached Design Documentation And The Technical Specification For The Execution And Acceptance Of Construction Works. The Works Should Be Carried Out In Accordance With The Design Documentation. 4.4. Construction Works Will Be Carried Out In Accordance With The Final Decision No. 331/2025, Reference Number: Ab-K.6740.182.2025.Gl - Construction Permit, Issued By The Starosta Of Pabianice On October 13, 2025 (Scan Of The Document Attached). The Subject Of The Contract Should Be Pe
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120354917
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.