Road Bridge Construction Work – Hosingen Bypass – Lot C3.1 – Oa881, Future Cr342 And Pc07. Lot C3.1 Includes The Construction Of The Oa881 Engineering Structure, The Bf3 Retention Basin, As Well As The Associated Road Improvements, Including The Pc7 Cycle Path. This Submission Begins At Pk 0+000 Of The Future Cr342 And Ends At Pk 1+850, Upstream Of The Future Leemkaul/Dorscheid Interchange As Part Of The Hosingen Bypass. Excavated: 51,500 M3 Embankments: 123,000 M3 Lime Supply: 1,600 To Coated: 8,800 To Reinforcements: 574,000 Kg Formwork: 5,500 M2 Concrete: 4,000 M3