|
Solar Installation – Construction Of A Photovoltaic Installation With An Energy Storage Facility For 4 Organizational Units Of Janów County. The Subject Of The Order Is Construction Of A Photovoltaic Installation With An Energy Storage Facility For 4 Organizational Units Of Janów County, With Parameters Consistent With Those Presented In The Description Of The Subject Of The Order Constituting Annex No. 1 To The Swz. 1) The Scope Of The Subject Matter Of The Order Includes The Delivery, Installation And Commissioning Of Five Photovoltaic Systems, I.E. One Photovoltaic System With A Capacity Not Exceeding 45 Kwp And An Energy Storage Facility With A Maximum Capacity Of 45 Kwh For The System In The Location Barka Social Welfare Home Jana Pawła Ii In Janów Lubelski And Four Photovoltaic Systems With A Capacity Not Exceeding 50 Kwp In Each System And Four Energy Storage Facilities With A Maximum Capacity Of 50 Kwh Each Storage Facility, In Other Locations, Including: A) Delivery Of Brand New Devices Manufactured In The Last 24 Months Preceding The Date Of Putting The Installation Into Use, Unused Before The Date Of Delivery, Coming From The Official Distribution Channels Of The Manufacturer And Undamaged And Not Encumbered With The Rights Of Persons Third Parties In The Scope Specified In Annex No. 1 To The Swz, Including Transport, Bringing, Setting, Assembly, Assembly, Connection, In Places Indicated By The Ordering Party At The Contractors Expense And Risk, B) Construction Of Roof Structures For Individual Photovoltaic Installations For Sets Of Panels (One Installation With A Total Capacity Of 45 Kwp And Four Separate Installations With A Total Capacity Of 50 Kwp Each) In Accordance With The Design Documentation And Technical Specifications, C) Construction Of Cable Routes Resistant To Weather Conditions, D) Construction Of One Photovoltaic Installation With A Capacity Of 45 Kwp And Four Photovoltaic Installations With A Capacity Of 50 Kwp Each (Photovoltaic Panels, Accompanying Devices, Inverters, Cabling, Etc.) In Accordance With The Design Documentation And Technical Specifications, E) Construction Of Earthing Installations Together With Measurements Of Earth Electrode Resistance, F) Installation Of Fire Protection Switches, G) Installation Of External Energy Storage Facilities In Accordance With With Design Documentation And Technical Specifications. H) Launching And Carrying Out Tests And Measurements Of Individual Installations, I) Performing, On Behalf Of And For The Benefit Of The Ordering Party, All Necessary Formal And Legal Activities Related To The Completion Of The Investment And Obtaining Appropriate Consents, Decisions, Permits, Permits, Arrangements, Including, Among Others: Confirmation Of The Effective Connection Of Individual Micro-Installations To The Distribution Network, Enabling Legal Use Of The Subject Of The Order. J) Completing And Presenting To The Ordering Party, Together With The Notification For Collection, All Necessary Documents Constituting The As-Built, Technical And Operational Documentation Related To The Subject Of The Order, In Particular: Installation, Connection And Arrangement Diagrams Of Panels And The Warehouse, Lists Of Devices (Panels, Inverter, Warehouse, Security), Electrical Measurement Protocols
|