|
Tenders Have Been Invited For The Gomti Riverfront Project; Various Development Works Will Be Undertaken At Different Locations Between Daliganj Bridge And Hanuman Setu, Covering The 12-Month Period Of The 2027-28 Financial Year.- 1 Hiring Of Diesel Pump Including Suction & Delivery Pipe, Operator & Khalashi And Pol Complete With All Respect (As Per Irrigation Department Sor 2017-18 Chapter 1 B (Page No-3 S. No-8)= 31.00 Per Hp/Hour Cost Analysis For Irrigation With The Help Of Diesel Pump Set (7.5 Hp) Analysis Copy Attached 2 Supply & Stacking Urea 40% Nitrogen @ 160 Kg Per Acre (As Per Yard Stick Of Cpwd Lda Sor 2018-19/11.1 ( @2512Kg For 30 Acres ) 3 Supply & Stacking Dap 50 Kg Per Acre/Year. Lda Sor 2018-19/11.2 4 Arrangement Of Tractor Trolly Including Loading Unloading Of Stacked Kuda & Malwa, Removel Of Garden Wastage Including All Complete Of Work. 5 Earth Work In Excavation By Mechanical Means (Hydraulic Excavator) / Manual Means In Foundation Trenches Or Drains (Not Exceeding 1.5 M In Width Or 10 Sqm On Plan) Including Dressing Of Sides And Ramming Of Bottoms, Lift Up To 1.5 M, Including Getting Out The Excavated Soil And Disposal Of Surplus Excavated Soil As Directed, Within A Lead Of 50 M., All Kinds Of Soil. 6 Providing And Laying In Position Specified Grade Of Reinforced Cement Concrete, Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement - All Work Up To Plinth Level :, 1:1.5:3 (1 Cement : 1.5 Coarse Sand (Zone-Iii) Derived From Natural Sources : 3 Graded Stone Aggregate 20 Mm Nominal Size Derived From Natural Sources) 7 Providing And Fixing G.I. Chain Link Fabric Fencing Of Required Width In Mesh Size 25X25 Mm Made Of G.I. Wire Of Dia 3 Mm Including Strengthening With 2 Mm Dia Wire Or Nuts, Bolts And Washers As Required Complete As Per The Direction Of Engineer-In-Charge. 8 Steel Work Welded In Built Up Sections/ Framed Work, Including Cutting, Hoisting, Fixing In Position And Applying A Priming Coat Of Approved Steel Primer Using Structural Steel Etc. As Required., In Gratings , Frames, Guard Bar , Ladder, Railings , Brackets , Gates And Similar Works 9 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :, 1:4:8 (1 Cement : 4 Coarse Sand (Zone-Iii) Derived From Natural Sources : 8 Graded Stone Aggregate 40 Mm Nominal Size Derived From Natural Sources). 10 Complete Maintenance Of The Entire Garden Features Having As Per Yard Stick In The Garden Area I.E. Lawn Trees, Shrubs, Herbs, Edge, Flower Beds, Foliages, Creepers Etc. Including Hoeing,Weeding, Pruning, Replacement Of Plants, Gap Filling, Watering, Mowing Of Lawn, Grass Cutting By Lawn Mover And Brush Cutter, Removal Of Garden Waste, Applying Insecticide, Pesticide & Fertilizers (Whenever Required) Top Dressing Of Lawn With Good Earth And Manure And Maintenance Of Other Garden Related Works As Directed By Office-In-Charge (Cost Of Good Earth, Manure, Fertilizer, Insecticide, Pesticide Will Be Provided By The Department & Lawn Mover And Brush Cutter With Fuel And Other T & P Material/Articles Shall Be Provided By The Contractor.) And As Per Direction Of Officer In Charge., Complete Maintenance Of The Entire Garden Features Having As Per Yard Stick In The Garden Area I.E. Lawn Trees, Shrubs, Herbs, Edge, Flower Beds, Foliages, Creepers Etc. Including Hoeing,Weeding, Pruning, Replacement Of Plants, Gap Filling, Watering, Mowing Of Lawn, Grass Cutting By Lawn Mover And Brush Cutter, Removal Of Garden Waste, Applying Insecticide, Pesticide & Fertilizers (Whenever Required) Top Dressing Of Lawn With Good Earth And Manure And Maintenance Of Other Garden Related Works As Directed By Office-In-Charge (Cost Of Good Earth, Manure, Fertilizer, Insecticide, Pesticide Will Be Provided By The Department & Lawn Mover And Brush Cutter With Fuel And Other T & P Material/Articles Shall Be Provided By The Contractor.) Play Grounds / Public Parks (1Mali For 2.00Acre).
|