Switching Station Installation Work – New Nord+ Comprehensive School In Kassel - Kg 480 Building And System Automation. The Services Include The Manufacture, Delivery And Assembly Of The Msr Systems For The Entire Property. This Includes The Control Of Five Air Conditioning Systems That Are Controlled Using Presence Detection. For Events, Two Of The Systems Can Be Switched To Co2 Control. There Are Separate Exhaust Fans For The Garbage Rooms, Kitchen Exhaust Air And The Central Cleaning Chemicals. The Controls For The Laboratory Exhaust Air And The Smoke Extraction Of The Ceramic Kiln Require Special Attention. Smoke Extraction Is Planned For The Cafeteria Using Airflow Through Doors. Heat Is Supplied Using District Heating. The Msr Ensures The Regulation Of The Feed Pumps And Units In The Heating Distributor. The Hallways Are Heated By Underfloor Heating, Which Is Also Controlled. Furthermore, Fault Reports And Sensor Data From Various Trades Such As Plumbing And Heating Must Be Collected, Processed And Stored. The Control Of The Two Refrigeration Machines And The Cold Distribution Is Also The Task Of The Msr. All Of This Is Implemented Conventionally Via Eight Asps And Five Gsvs. With The Exception Of All Meters In The Building, Which Are Connected Via M-Bus. The Client Reserves The Right To Transfer Cost Groups 200 And 400 Partially Or Completely To A Municipal Supplier As The Client.
Contact Information
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 120308078
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.