|
1. The Subject Of The Order Is The Design And Implementation Of Construction Works Consisting In The Thermal Modernization Of Two Buildings (Ugim And Sm) Together With The Replacement Of One Heating Node, Construction Of Two Photovoltaic Installations, Including One In The Form Of The So-Called Carport Located In Czerwionka-Leszczyny At Ul. Parkowa 9. 2. The Subject Of The Order, Specified In Point 1, Includes In Particular The Material Scope, Including: 1) The Design Phase, The Subject Of Which Is The Preparation Of The Following Studies: A) Construction Design With The Necessary Arrangements - 6 Copies Of The Paper Version (Including 2 Copies For The Architectural And Construction Administration Body), B) Executive Designs - 4 Copies Of The Paper Version, C) Bill Of Quantities - 2 Copies Of The Paper Version, D) Investors Cost Estimate With A Bill Of Quantities - 1 Copy Of The Paper Version, E) Technical Specifications For The Execution And Acceptance Of Construction Works For The Entire Task - 2 Copies Of The Paper Version. Additionally, All The Above-Mentioned Documents And Studies Will Be Delivered To The Ordering Party In 1 Copy In Electronic Version On A Cd Or Dvd In .Pdf Format And In An Editable Version. The Contractor Will Make All Arrangements And Notifications, And Will Also Obtain All Permits Necessary To Carry Out And Complete The Construction Works, Including In Particular: ▪ The Final Decision On A Building Permit, If Necessary, ▪ Arrangements With Utility Suppliers, ▪ Arrangements With A Fire Protection Appraiser, Documentation Should Be Prepared In Accordance With The Requirements Of The Construction Law Act Of July 7, 1994, The Provisions Of The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location, Regulation Of The Minister Of Infrastructure Of September 18, 2020 On The Detailed Scope And Form Of The Construction Project, Regulation Of The Minister Of Infrastructure Of December 29, 2021, On Determining The Methods And Basis For Preparing The Investors Cost Estimate, Calculating Planned Design Works And Planned Costs Of Construction Works Specified In The Functional And Utility Program, Regulation Of The Minister Of Infrastructure Of December 29, 2021 Regarding The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program And The Requirements Of The Act Of September 11, 2019, Public Procurement Law And Others (Fire Protection, Occupational Health And Safety, Etc.). In Addition, Solutions Resulting From The Act Of July 19, 2019 On Ensuring Accessibility For Persons With Special Needs, In Particular Art. 6 Of The Act. The Investors Cost Estimate Must Be Agreed With And Accepted By The Ordering Party. The Ordering Party Has The Right Not To Accept The Cost Estimate If Individual Unit Prices Differ Significantly From Market Prices. Failure To De
|