|
1. The Subject Of The Order Is The Design And Implementation Of Construction Works Consisting In The Thermal Modernization Of The Building Of The Room With Hygienic, Sanitary And Storage Facilities Of The Czerwionka Volunteer Fire Department (Hereinafter Referred To As Osp Czerwionka), Together With The Replacement Of The Heat Source And The Installation Of Photovoltaic Installations, Located In Czerwionka-Leszczyny At Ul. Rynek 6. 2. For The Subject Of The Order Specified In Section 1, In Particular, Includes The Material Scope Including: - Design Phase, The Subject Of Which Is The Preparation Of The Following Studies: A) Construction Design With The Necessary Arrangements - 6 Copies Of The Paper Version (Including 2 Copies For The Architectural And Construction Administration Body), B) Executive Designs - 4 Copies Of The Paper Version, C) Bill Of Quantities - 2 Copies Of The Paper Version, D) Investors Cost Estimate With The Bill Of Quantities - 1 Copy Of The Version Paper Version,E) Technical Specifications For The Execution And Acceptance Of Construction Works For The Entire Task - 2 Copies Of The Paper Version. Additionally, All The Above-Mentioned Documents And Studies Will Be Delivered To The Ordering Party In 1 Copy In Electronic Version On A Cd Or Dvd In The .Pdf Format And In An Editable Version. The Contractor Will Make All Arrangements And Notifications, And Will Also Obtain All Permits Necessary To Carry Out And Complete The Construction Works, Including In Particular:• The Final Decision On The Building Permit, If Necessary,• Arrangements With Utility Suppliers, • Arrangements With A Fire Expert. The Documentation Should Be Prepared In Accordance With The Requirements Of The Construction Law Act Of July 7, 1994, The Provisions Of The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location, The Regulation Of The Minister Of Infrastructure Of September 18, 2020 On The Detailed Scope And Form Of The Construction Project, Regulation Of The Minister Of Infrastructure Of December 29, 2021 On Determining The Methods And Basis For Preparing The Investors Cost Estimate, Calculating Planned Design Works And Planned Costs Of Construction Works Specified In The Functional And Utility Program, Regulation Of The Minister Of Infrastructure Of December 29, 2021. Regarding The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program And The Requirements Of The Act Of September 11, 2019, Public Procurement Law And Others (Fire Protection, Occupational Health And Safety, Etc.). In Addition, Solutions Resulting From The Act Of July 19, 2019 On Ensuring Accessibility For Persons With Special Needs Should Be Provided For, In Particular Art. 6 Of The Act. The Investors Cost Estimate Must Be Agreed With And Accepted By The Ordering Party. The Ordering Party Has The Right
|